BLD-Final | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Jim Storey
|
|
|
The saftey glass has been installed. Please contact Chris Palmer @ ###-#### to coordinate a time for inspection if you need someone from ESI present. Phone #: ###-#### >> final complet no card on site for Inspection.
|
DOC - Permit Finaled | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/1/2012 | 8/2/2012 | 8/2/2012 | P | FAIL |
Jim Storey
|
|
|
Please call me an hour ahead of schedule if at all possible. I am finalling out 3 projects today. Thanks so much! Phone #: ###-#### >> Inspection requested via web by Chris Palmer need saftey glazing inedtafacation on divider large pane w/24 of office door.
|
FIRE-Final Inspection | 7/31/2012 | 8/1/2012 | 8/2/2012 | A | PASS |
Forrest France
|
|
|
Life safety inspection passed.
|
BLD-Final | 7/31/2012 | 8/1/2012 | 8/1/2012 | P | NR |
Tom Arcoraci
|
|
|
Please contact Chris Palmer @ ###-#### to set up a meeting time for the inspection. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy
|
BLD-Conference | 7/31/2012 | 8/1/2012 | 7/31/2012 | A | CANC |
Jim Storey
|
|
|
Please contact Chris Palmer @ ###-#### to set up a time for the inspection. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy Inspection cancelled from web by: Brandon McCurdy
|
BLD-Other | 6/27/2012 | 6/28/2012 | 6/28/2012 | P | PASS |
Jim Storey
|
|
|
Ceiling -- Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 6/15/2012 | 6/18/2012 | 6/18/2012 | P | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-####
|