Description
(QDOBA RESTAURANT - SUITE #130 - SOUTH END OF BUILDING) The fire sprinkler system is used for building area increase. To construct a new restaurant within an existing 2,069 square foot tenant space. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, suspended acoustical ceilings, gypsum board ceilings, millwork, and interior finishes. Kitchen equipment includes a grease exhaust hood and make-up air unit, two Type II exhaust hoods, gas fryer, char-broiler grill, 6 open burner range, grease trap, walk-in cooler, etc. The existing steel roof structure will be altered to support the added roof load from new roof top mechanical equipment. Special Inspection is required for welding. The Special Inspector is required to be employed by the owner or his authorized representative, not by the Contractor. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection7/27/20127/27/20127/31/2012PPASS
DetailsForrest France
Fire life safety passed final inspection.
BLD-Final7/29/20127/30/20127/30/2012APASS
DetailsDave Hannah
Jim Phone #: ###-#### >> Inspection requested via web by Christina Wellman ok for perm occ ? on public works are they on temp
BLD-Final7/27/20127/27/20127/30/2012PCANC
DetailsDave Hannah
Jim Phone #: ###-#### >> Inspection requested via web by Christina Wellman
BLD-Final7/26/20127/27/20127/27/2012ACANC
DetailsDave Hannah
Jim Phone #: ###-#### >> Inspection requested via web by Christina Wellman
FIRE-Final Inspection7/26/20127/26/20127/27/2012PNR
DetailsForrest France
Project related FIR permit finals pending. Correction items noted, project finishes underway.
BLD-Final7/26/20127/26/20127/26/2012PNR
DetailsDave Hannah
Jim Phone #: ###-#### >> Inspection requested via web by Christina Wellman
BLD-Final7/26/20127/26/20127/26/2012ACANC
DetailsDave Hannah
Jim Phone #: ###-#### >> Inspection requested via web by Christina Wellman Inspection cancelled from web by: Christina Wellman
BLD-Other7/19/20127/19/20127/19/2012APASS
DetailsDave Hannah
Grid inspection Jim is the contact name. Phone #: ###-#### >> Inspection requested via web by Christina Wellman
BLD-Other7/18/20127/18/20127/18/2012PNR
DetailsDave Hannah
Christina Phone #: ###-####
FIRE-Conference7/10/20127/10/20127/10/2012ADONE
DetailsForrest France
Conversation with contractor regarding sprinkler monitoring and hood suppression system.
BLD-Energy code compliance6/26/20126/26/20126/27/2012PPASS
DetailsDave Hannah
Jim Phone #: ###-####
BLD-Framing/Rough-in6/24/20126/25/20126/25/2012APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Christina Wellman