Permit Information
Permit NumberBLD12-00681
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 1449 S GOLDKING WAY
Project NameUnion Square Apartments Bld 8
Customer Number 
ePlanReviewNo
Description
(Union Square Apartments, BLD - 8) To construct a wood frame, three story, 22,728 sq. ft., 24 Unit Multi Family Dwellings (12-2B/2B) (12-1B/1B), per reviewed plans. All units exceed 800 sq. ft., are fully sprinklered W/ alarm. Work includes associated site work, footing & foundation, structural & non-structural framing; electrical, mechanical, plumbing, sprinkler & alarm work; fire-resistive construction between units, at stair enclosures or rated corridor breezeways; accessible Type 'B' units; interior cabinetry, wall, floor and ceiling finishes and fixtures. All per the reviewed plans. drs DRH12-00022 CUP08-00045 DRH12-00022 CUP08-00045
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/12/20136/12/20136/12/2013APASS
DetailsMike Jordan
Per previous inspection results
BLD-Final4/11/20134/12/20134/12/2013APART
DetailsMike Jordan
mike Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning and public works have signed perm
BLD-Final4/10/20134/11/20134/11/2013AFAIL
DetailsMike Jordan
mike Phone #: ###-####. Complete fire caulking under lavs and install smoke seals and self closinng doors at draft stops in attic.
FIRE-Final Inspection4/10/20134/10/20134/10/2013PPASS
DetailsTroy Cobbley
Life safety passed. Smoke alarms tested.
FIRE-Conference2/5/20132/6/20132/6/2013ADONE
DetailsTroy Cobbley
Smoke Alarm Conference with Jerry with Trax Electric. We went over spacing requirements with smoke alarms.
BLD-Other11/14/201211/14/201211/14/2012PPASS
DetailsMike Jordan
BLD-Energy code compliance11/9/201211/13/201211/13/2012PPASS
DetailsJim Sly
Kelly phone
BLD-Energy code compliance11/9/201211/9/201211/9/2012PNR
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
Had a few corrections to complete before approval.
BLD-Framing/Rough-in11/6/201211/6/201211/6/2012PPASS
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
BLD-Wall Bracing10/25/201210/25/201210/25/2012APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. Exterior shear ok. All interior shear has been eliminated per structural engineer.
BLD-Wall Bracing10/23/201210/23/201210/23/2012PFAIL
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. Tighten all holddowns, and provide blocking at shear wall locations.
BLD-Foundation7/27/20127/27/20127/27/2012PPART
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing7/24/20127/24/20127/24/2012PPART
DetailsMike Jordan
dane Phone #: ###-####. work in progress on installing veertical steel.