BLD-Final | 5/3/2013 | 5/3/2013 | 5/3/2013 | P | PART |
Mike Jordan
|
|
|
mike Phone #: ###-####. Ok for temp occ. Will be ok for perm occ once zoning has finaled.
|
FIRE-Final Inspection | 5/2/2013 | 5/3/2013 | 5/2/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Smoke alarms and doors tested ok.
|
BLD-Conference | 3/11/2013 | 3/11/2013 | 3/11/2013 | A | PASS |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. ok for perm occ.
|
BLD-Other | 12/11/2012 | 12/11/2012 | 12/11/2012 | P | PASS |
Mike Jordan
|
|
|
1st., 2nd and 3rd floor party walls and interior shear walls ok at east corridor.
|
BLD-Other | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | PASS |
Mike Jordan
|
|
|
1st. and 2nd. floor party walls and interior gyp board shear walls ok.
|
BLD-Other | 12/10/2012 | 12/10/2012 | 12/10/2012 | A | FAIL |
Mike Jordan
|
|
|
1st. and 2nd floor shear walls and party walls missing some 5/8 type x and party walls not attached per approved plans.
|
BLD-Other | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PASS |
Mike Jordan
|
|
|
3rd floor sheet rock ok to mud and tape.
|
BLD-Other | 12/6/2012 | 12/7/2012 | 12/7/2012 | A | PART |
Mike Jordan
|
|
|
3rd floor fire partitions and shear walls, work in progress.
|
BLD-Other | 12/6/2012 | 12/6/2012 | 12/6/2012 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Other | 12/6/2012 | 12/6/2012 | 12/6/2012 | P | PART |
Mike Jordan
|
|
|
Third floor fire partitions and shear walls. All dry wall is hung, needs to provide additional attachment on shear walls and fire partitions per the approved plans.
|
BLD-Energy code compliance | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. All issues have been resolved.
|
BLD-Energy code compliance | 12/3/2012 | 12/4/2012 | 12/4/2012 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. Waitng for new set of city approved plans with all canges updated to them.
|
BLD-Energy code compliance | 12/3/2012 | 12/4/2012 | 12/4/2012 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
BLD-Energy code compliance | 11/29/2012 | 11/30/2012 | 11/30/2012 | A | FAIL |
Mike Jordan
|
|
|
Energy ok, still needs to complete fire caulking at tub drains, complete floor ceiling assemblies at furnace and repair draft stops in attic were fire sprinkler penetrates.
|
BLD-Energy code compliance | 11/28/2012 | 11/29/2012 | 11/29/2012 | P | PART |
Mike Jordan
|
|
|
Please let me know when you get on site. If possible I would like to tag along. Thanks- Fred DePold I work with Kelly Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. no cover a this time.
|
BLD-Framing/Rough-in | 11/27/2012 | 11/27/2012 | 11/27/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
BLD-Framing/Rough-in | 11/20/2012 | 11/20/2012 | 11/20/2012 | A | PART |
Mike Jordan
|
|
|
perliminary walk through only. Still waiting on trades. no cover at this time.
|
BLD-Wall Bracing | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman exterior ok to cover.
|
BLD-Foundation | 8/7/2012 | 8/7/2012 | 8/7/2012 | P | PASS |
Mike Jordan
|
|
|
john Phone #: ###-####
|
BLD-Footing | 8/3/2012 | 8/3/2012 | 8/3/2012 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####
|