BLD-Final | 3/7/2013 | 3/8/2013 | 3/8/2013 | A | PASS |
Tom Arcoraci
|
|
|
occupancy card in the guard shack Phone #: ###-#### >> Inspection requested via web by Mark Bowen
|
FIRE-Final Inspection | 3/6/2013 | 3/6/2013 | 3/6/2013 | P | PASS |
Forrest France
|
|
|
Life safety passed pending manual thumbturn at the exit door is removed- to be corrected prior to structural final inspection for verification at that time per agreement with contractor.
|
BLD-Concrete | 11/5/2012 | 11/5/2012 | 11/5/2012 | P | PASS |
Tom Arcoraci
|
|
|
Ask for Frank. Guard House monolithic slab pour. Phone #: ###-#### >> Inspection requested via web by Mark Bowen
|