BLD-Final | 7/30/2012 | 7/30/2012 | 7/31/2012 | P | DONE |
Tony Young
|
|
|
Joe Phone #: ###-####
|
BLD-Final | 7/30/2012 | 7/31/2012 | 7/31/2012 | A | PASS |
Tony Young
|
|
|
Joe Phone #: ###-####
|
DOC - Permit Finaled | 7/31/2012 | 7/31/2012 | 7/31/2012 | P | PASS |
Tony Young
|
|
|
c of c issued,, ok per plan
|
BLD-Energy code compliance | 6/14/2012 | 6/15/2012 | 6/15/2012 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-#### - call 30 prior ,, c/n posted,, ok to cover when ready
|
BLD-Energy code compliance | 6/12/2012 | 6/13/2012 | 6/14/2012 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-#### - call 30 prior ,, need to fireblock chase above fireplace
|
BLD-Energy code compliance | 6/13/2012 | 6/14/2012 | 6/14/2012 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-#### - call 30 prior ,, need to provide fireblock at top of f/p chase,, insulation in walls ok
|
BLD-Framing/Rough-in | 6/11/2012 | 6/12/2012 | 6/12/2012 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-#### - call 30 prior
|
BLD-Framing/Rough-in | 6/11/2012 | 6/11/2012 | 6/11/2012 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 6/6/2012 | 6/8/2012 | 6/7/2012 | P | CANC |
Mike Jordan
|
|
|
Josh Phone #: ###-#### - call 30 mins prior. Needs mech. ri inspection.
|
BLD-Framing/Rough-in | 5/31/2012 | 6/1/2012 | 6/1/2012 | A | NR |
Tony Young
|
|
|
Josh Phone #: ###-####
|
BLD-Wall Bracing | 5/24/2012 | 5/25/2012 | 5/25/2012 | P | PASS |
Tony Young
|
|
|
Joe please call 15 min before going out Phone #: ###-####,, exterior ok to cover
|
BLD-Framing/Rough-in | 5/24/2012 | 5/24/2012 | 5/24/2012 | P | NR |
Tony Young
|
|
|
Joe please call 15 min before going out Phone #: ###-####,, not ready for a frame,, this was for a wall cover,, exterior ok to cover
|
BLD-Conference | 5/8/2012 | 5/8/2012 | 5/8/2012 | P | PEND |
Tony Young
|
|
|
ron Phone #: ###-####,, need an engineer to look at a point load and connections
|
BLD-Footing | 4/24/2012 | 4/26/2012 | 4/26/2012 | A | PASS |
Tom Arcoraci
|
|
|
late as possible in am//Joe Phone #: ###-####
|
BLD-Conference | 4/23/2012 | 4/23/2012 | 4/23/2012 | P | PART |
Tony Young
|
|
|
regarding footings and existing conditions//Joe Phone #: ###-####,, ?s on existing structure,, no footings,,, tie into the best way possible and add a new footing next to existing,, ok per architect also..
|