BLD-Final | 7/6/2012 | 7/9/2012 | 7/9/2012 | A | PASS |
Tom Arcoraci
|
|
|
Brandon Please call 30 min before going out Phone #: ###-#### done by 301
|
BLD-Aging Inspection | 7/2/2012 | 7/2/2012 | 7/2/2012 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 7/2/2012 | 7/2/2012 | 7/2/2012 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 4/30/2012 | 5/1/2012 | 5/1/2012 | P | PART |
Jim Storey
|
|
|
BRANDON PLEASE CALL 30 MIN BEFORE Phone #: ###-#### final ok pending plm sign off
|
FIRE-Final Inspection | 4/30/2012 | 5/1/2012 | 5/1/2012 | A | PASS |
Forrest France
|
|
|
Correction items verified for completion. Fire life safety finaled.
|
FIRE-Final Inspection | 4/27/2012 | 4/30/2012 | 4/30/2012 | A | FAIL |
Forrest France
|
|
|
Correction items include; post "door to remain unlocked..." signage at the main entry/exit, provide approved hardware at the restroom and main exit doors. See permit docs for details.
|