Permit Information
Permit NumberBLD12-00932
StatusFinaled
Name ESI
Site Address 800 W MAIN ST
Project Name8th & Main Tower
Customer Number 
ePlanReviewNo
Description
(8TH AND MAIN TOWER - FOUNDATION AND SUPERSTRUCTURE) - To construct the foundation and structural frame for a new 345,260 sq. ft., eighteen story building with an 18,800 sq. ft. basement and related site improvements. This permit will also include underground utilities. The building will be constructed of concrete foundation and structural core, some masonry exterior walls and steel structural frame. Work under this permit shall not proceed beyond the foundation and superstructure until final approval of plans and issuance of the next phase building permit. That permit has not yet been applied for. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the foundation and building structure work as may be required to comply with the City Codes and the final approved building plans and conditions. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/6/20143/6/20143/6/2014APASS
DetailsDave Hannah
DOC - Permit Finaled3/6/20143/6/20143/6/2014PPASS
DetailsDave Hannah
BLD-Conference1/31/20142/3/20142/3/2014APEND
DetailsDave Hannah
Meet with ESI and CTA Architects, ESI field office, Please contact Adam in advance to ensure CTA can meet at the same time. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection11/20/201311/20/201311/21/2013PPART
DetailsDave Hannah
1ST FL CEILING - jeff Phone #: ###-#### hard lid lobby area ok to cover
BLD-Framing/Rough-in11/12/201311/13/201311/13/2013APART
DetailsDave Hannah
Rescheduled from 11/12/13, Shell and Core Exterior fireproofing inspection, prior to cover on 9th, 10th and 14th Floor , exterior perimeter. Jamal is requesting a walk at 10:30 am. Thanks. oAdam ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to insulate and cover perm walls and columns
BLD-Framing/Rough-in11/6/201311/12/201311/12/2013ACANC
DetailsTom Arcoraci
Shell and core exterior fireproofing inspection, prior to cover, on 9th, 10th and 14th floors, exterior perimeter. Jamal is requesting a walk at 10:30 am. Thanks. Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference10/22/201310/24/201310/24/2013ADONE
DetailsDave Hannah
Dave, Need to get Troy out for an inspection on Grease Duct in Alley, MECH is not under my control to schedule inspection. Would like to see if we could coordinate a on site conference with Troy in the morning, 10/23/13 Please call me when possible. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/24/201310/24/201310/24/2013APART
DetailsDave Hannah
Inspection scheduled via John Woods. Adam is off site this morning, contact John for inspection needs. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson walked floors 1-17 with john
BLD-Framing/Rough-in10/22/201310/23/201310/23/2013APART
DetailsDave Hannah
Framing inspection for John Woods, also while on site, confirm framing sign offs to ESI binder for 12th and 9th floor TI''s. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson slab edge fire proofing ok 16 -10 at tower crain location also ok to cover 15&16 at same loction
BLD-Wall cover10/16/201310/17/201310/17/2013AFAIL
DetailsDave Hannah
Request for cover inspection on 8th street grease duct at 805 Building in alley. Coordinate inspection with Roger ###-####. Thanks Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Wall cover10/3/201310/3/201310/4/2013PPART
DetailsDave Hannah
8th floor shell and core perimeter fire proofing verification. Exterior wall. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson ext walls and columns ok to insulate and cover
BLD-Conference9/30/201310/1/201310/2/2013APEND
DetailsDave Hannah
Weekly Shell and Core inspection. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference9/23/20139/24/20139/24/2013ADONE
DetailsDave Hannah
Weekly Core and Shell inspection walk.

Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference9/16/20139/17/20139/19/2013APART
DetailsDave Hannah
Shell and Core Weekly Inspection. Stair Framing at 16 to 17th as well.

Thanks, Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference9/11/20139/12/20139/12/2013APASS
DetailsDave Hannah
Weekly inspection walk of Shell and Core. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference9/3/20139/5/20139/5/2013APASS
DetailsDave Hannah
Weekly inspection request. Shell and Core.

Thanks, Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference8/26/20138/27/20138/28/2013APART
DetailsDave Hannah
Weekly Shell and Core inspection. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference8/12/20138/13/20138/15/2013APASS
DetailsDave Hannah
Weekly inspection walk, Adam ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference8/5/20138/6/20138/7/2013ADONE
DetailsDave Hannah
Please note weekly inspection for shell and core scope of work. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Foundation7/22/20137/23/20137/23/2013APART
DetailsDave Hannah
Weekly job walk. ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference7/16/20137/16/20137/16/2013PPART
DetailsTom Arcoraci
Weekly inspection walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson no insp made
BLD-Conference7/8/20137/9/20137/9/2013ADONE
DetailsDave Hannah
Weekly Inspection Request. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference7/1/20137/2/20137/2/2013APASS
DetailsDave Hannah
Need to inspect sheathing screws at 17th Floor. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/25/20136/26/20136/27/2013APASS
DetailsDave Hannah
17th floor sheetrock screw inspection. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/24/20136/25/20136/25/2013APART
DetailsDave Hannah
Weekly Inspection Walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/17/20136/20/20136/21/2013ADONE
DetailsDave Hannah
Weekly job inspection. Adam ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in6/18/20136/18/20136/19/2013PPART
DetailsDave Hannah
Weekly Inspection. Adam ###-#### >> Inspection requested via web by Adam Johnson 17 floor restroom ok to cover and second floor perimeter fire proofing ok
BLD-Conference6/17/20136/18/20136/19/2013ACANC
DetailsDave Hannah
Weekly Inspection. Adam ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/7/20136/11/20136/12/2013APASS
DetailsDave Hannah
Weekly inspection walk, framing, firestop, etc. Contact Adam ESI, John, FCS. Thank You. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/7/20136/10/20136/11/2013APART
DetailsDave Hannah
Document hand off of 1st and 3rd Floor Fire Duct Wrap and Support. Phone #: ###-#### >> Inspection requested via web by Adam Johnson I need hanging suport data
BLD-Conference6/3/20136/4/20136/4/2013APASS
DetailsDave Hannah
Weekly inspection walk. Forte Construction items, ADA countertop, and Catchup on 11th floor perimeter. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference5/31/20136/3/20136/4/2013APEND
DetailsDave Hannah
Scheduled inspection for 9:00 a.m. to meet with Jamal, Cabinet and Plumbing contractor to review restroom countertops. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference5/13/20135/14/20135/22/2013APART
DetailsDave Hannah
Weekly Inspection Walk. Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson see sign off book
BLD-Conference5/20/20135/21/20135/22/2013APART
DetailsDave Hannah
Weekly Job Inspection. Phone #: ###-#### >> Inspection requested via web by Adam Johnson see sign off book
BLD-Conference5/3/20135/6/20135/6/2013APART
DetailsDave Hannah
Framing walk of 8th floor with FCS, and ESI. AKJ ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover 8th and 9th floor rest rooms and south stair tower
BLD-Conference4/19/20134/22/20134/22/2013APART
DetailsDave Hannah
Scheduled Inspection of Stair 1 : 1st Thru 5th Floors. Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson ( ok to sheetrock stair #1 basement thru floor 5 )
BLD-Framing/Rough-in4/10/20134/10/20134/17/2013APART
DetailsDave Hannah
BLD-Conference4/8/20134/9/20134/10/2013AFAIL
DetailsDave Hannah
Weekly Inspection Walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson c/n on site
BLD-Conference3/25/20133/26/20133/27/2013ADONE
DetailsDave Hannah
Weekly Inspection Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference3/12/20133/12/20133/21/2013PPASS
DetailsDave Hannah
Weekly inspection, Shell and Core Walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in3/19/20133/19/20133/21/2013APART
DetailsDave Hannah
Weekly inspection, Shell and Core Walk. Phone #: ###-#### >> Inspection requested via web by Adam Johnson. I walked project today no new framing to sign off
BLD-Conference3/19/20133/19/20133/21/2013PCANC
DetailsDave Hannah
Phone #: 2084841503 >> Inspection requested via mobile web by Adam
BLD-Conference3/4/20133/5/20133/7/2013APART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Adam Johnson walked project with Jenifer.
BLD-Conference2/27/20132/28/20133/1/2013PPART
DetailsDave Hannah
Fireproofing Conference - 2:00 PM Phone #: ###-#### >> Inspection requested via web by Adam Johnson I had a meeting with contactors on inspections for fire proofing
BLD-Conference2/25/20132/26/20133/1/2013ADONE
DetailsDave Hannah
Weekly site inspection. Phone #: ###-#### >> Inspection requested via web by Adam Johnson attn weekly sub meeting schedule on track should start closing up walls in two weeks
BLD-Conference2/21/20132/21/20132/22/2013PPART
DetailsDave Hannah
BLD-Conference2/20/20132/20/20132/20/2013APASS
DetailsDave Hannah
S/C weekly building inspection. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference2/18/20132/19/20132/20/2013ACANC
DetailsDave Hannah
S/C weekly building inspection. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in2/12/20132/12/20132/14/2013APEND
DetailsDave Hannah
8th and Main Inspection Walk. BP-1 Phone #: ###-#### >> Inspection requested via web by Adam Johnson still waiting on rough ins
BLD-Conference2/11/20132/12/20132/14/2013PDONE
DetailsDave Hannah
8th and Main Inspection Walk. BP-1 Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference1/28/20131/29/20131/30/2013APART
DetailsDave Hannah
6th floor exterior framing, 3rd and 4th floor interior framing. Phone #: ###-#### >> Inspection requested via web by Adam Johnson all framing is ok but still needs other trades rough ins
BLD-Concrete1/2/20131/2/20131/3/2013PPART
DetailsDave Hannah
5th Floor SOD Pre Placement Inspection. 8th and Main.

Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok aftetr mti sign off
BLD-Concrete12/17/201212/19/201212/28/2012APART
DetailsDave Hannah
4th Floor SOD inspection (2nd Placement) Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Concrete12/18/201212/18/201212/19/2012PPASS
DetailsDave Hannah
4th Floor SOD inspection (1st Placement) Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Concrete12/17/201212/17/201212/18/2012PDEFR
DetailsDave Hannah
4th Floor SOD inspection (1st Placement) Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Concrete12/12/201212/12/201212/12/2012APART
DetailsDave Hannah
3rd floor crews working on south half for placement tomorrow
BLD-Concrete12/6/201212/6/201212/6/2012PPART
DetailsDave Hannah
second floor second pour and wall framing in basement
BLD-Concrete12/3/201212/3/201212/4/2012PPART
DetailsDave Hannah
jamal Phone #: ###-#### walked project crews are getting ready to place concrete for second floor