BLD-Final | 6/5/2013 | 6/6/2013 | 6/6/2013 | A | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 5/29/2013 | 5/30/2013 | 5/30/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 5/29/2013 | 5/29/2013 | 5/29/2013 | P | FAIL |
Troy Cobbley
|
|
|
Brent and I went over the resubmittal requirement that I need prior to a final sign off.
|
FIRE-Conference | 4/26/2013 | 4/26/2013 | 4/26/2013 | P | DONE |
Troy Cobbley
|
|
|
The fire dept access for this project does not match the approved plans. Scott and I discussed modifying the fire dept. access for existing conditions and it was approved with the condition that Brent, the owner, is to provide a modified plans showing the fenced yard enclosure, the tent structor and no access into the property from the south entrance.
|
FIRE-Conference | 4/23/2013 | 4/24/2013 | 4/24/2013 | P | DONE |
Troy Cobbley
|
|
|
BRENT and I went over life safety requirements which included fire extinguishers, exit signs and fire dept access. Per the plans the fence is to be removed but in actuallity only part of it has been removed. I deferred alternates for access to plan review.
|
BLD-Conference | 4/23/2013 | 4/23/2013 | 4/23/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 12/14/2012 | 12/14/2012 | 12/14/2012 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Conference | 8/30/2012 | 8/30/2012 | 8/30/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 8/28/2012 | 8/28/2012 | 8/28/2012 | P | PART |
Tom Arcoraci
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 8/23/2012 | 8/24/2012 | 8/24/2012 | A | PASS |
Tom Arcoraci
|
|
|
Gary Phone #: ###-####
|