BLD-Final | 5/19/2014 | 5/20/2014 | 5/20/2014 | P | PASS |
Mike Jordan
|
|
|
Charley Cooper Phone #: ###-#### >> Inspection requested via web by Lorrie Ferris
|
DOC - Permit Finaled | 5/20/2014 | 5/20/2014 | 5/20/2014 | P | PASS |
Mike Jordan
|
|
|
All issues have been resolved.
|
BLD-Blower Door Test Results | 5/20/2014 | 5/20/2014 | 5/20/2014 | P | DONE |
Mike Jordan
|
|
|
3.6
|
BLD-Final | 5/15/2014 | 5/16/2014 | 5/16/2014 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lorrie Ferris. Provide blower door test results and provide tempered glazing at window in 2nd. master bedroom.
|
BLD-Final | 5/14/2014 | 5/15/2014 | 5/15/2014 | P | NR |
Mike Jordan
|
|
|
contact person: Charley Cooper Phone #: ###-#### >> Inspection requested via web by Lorrie Ferris
|
BLD-Framing/Rough-in | 4/4/2014 | 4/7/2014 | 4/7/2014 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lorrie Ferris dry wall ok
|
BLD-Energy code compliance | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lorrie Ferris
|
BLD-Framing/Rough-in | 3/20/2014 | 3/21/2014 | 3/21/2014 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lorrie Ferris. Strap LVL beams to stud connection at north wall, also provide additional bearingfor northwest LVL. fireblock concealed space at ceiling next to clost behind shower stall. Provide straps at garage header for portal frame. No bearing for western most T14 truss. Ok to insulate. Correction notice posted.
|
BLD-Framing/Rough-in | 3/17/2014 | 3/18/2014 | 3/17/2014 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lorrie Ferris Inspection cancelled from web by: Lorrie Ferris
|
BLD-Conference | 11/28/2012 | 11/28/2012 | 11/28/2012 | P | FAIL |
Mike Jordan
|
|
|
A coorection notice was issued no wall bracing inspection has been done, tyvek and siding has been placed.
|
BLD-Foundation | 9/7/2012 | 9/12/2012 | 9/12/2012 | P | PASS |
Mike Jordan
|
|
|
Sebastian Phone #: ###-####
|
BLD-Footing | 9/7/2012 | 9/11/2012 | 9/11/2012 | P | PASS |
Mike Jordan
|
|
|
Sebastian Phone #: ###-####
|
BLD-Conference | 2/28/2014 | 2/28/2014 | | P | |
Mike Jordan
|
|
|
Bracing may be accomplished by gypsum on interior, nailed with 6D coolers at 7" o.c..
|