Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-01136
StatusFinaled
Name SCOTT HEDRICK CONSTRUCTION
Site Address 8100 W EMERALD ST
Project NameAffinity
Customer Number 
ePlanReviewYes
Description
(AFFINITY) Affinity has expanded into multiple (other) tenant spaces. No permits given for the tenant improvement work completed in the past. Existing permitted configuration has been documented. Current configuration has been documented as additional work. Any new spaces/rooms have been shown to be upgraded to current code. To establish a certificate of occupancy for Affinity business offices as a new tenant combining 6 existing tenant spaces to become one tenant space of 11,448 sq. ft. Work includes select interior demolition to open up tenant spaces to one another; construction of interior non-bearing walls to create new offices, hallways, two new accessible restrooms, new or relocated doors, lever hardware throughout, exit signage, emergency lighting, millwork, directional signage, electrical, mechanical, plumbing, all per reviewed plans to include red line notes on plans and all attached plan review reports of all reviewing agencies. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/7/20128/8/20128/8/2012APASS
DetailsMike Jordan
Jim Phone #: ###-####
FIRE-Final Inspection8/7/20128/8/20128/8/2012APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection8/2/20128/6/20128/6/2012AFAIL
DetailsTroy Cobbley
Sprinkler pendants are overspaced for ordinary hazard in the records room as well as spaced at 11' off a wall. Sprinkler pendants are also located too close, under 4", in acouple of other locations. One exit sign and one emergency light failed to function. All of the new door hardware with locks do not open in a single motion. One exterior exit door on the south side of the building needs to be provided with single action hardware and the thumbturn removed or remove all hardware all together and make it a window as discussed. Contractor provided verification of sprinkler monitoring through ADT.
FIRE-Conference7/25/20127/26/20127/26/2012ADONE
DetailsForrest France
Discussion with contractor regarding fire code review items and fire life safety conditions.
BLD-Conference7/25/20127/25/20127/25/2012PDONE
DetailsMike Jordan
MEt with contractor on site to discuss ADA compliance on job. Will need to submit plan mod for new drinking fountain location.