BLD-Final | 7/17/2012 | 7/17/2012 | 7/17/2012 | P | PASS |
Tony Young
|
|
|
david Phone #: ###-####
|
FIRE-Final Inspection | 7/17/2012 | 7/17/2012 | 7/17/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/12/2012 | 6/13/2012 | 6/13/2012 | A | PART |
Troy Cobbley
|
|
|
A TCO for 30 days under the condition that only the kitchen area may be occupied until the final CO has been issued was given with scott and romeo's permission until the occupant load is reduced and the fire sprinkler coverage is modified. Per Jeff with treasure valley fire protection drawings should be in to plan review by today or tomorrow.
|
BLD-Final | 6/12/2012 | 6/13/2012 | 6/13/2012 | A | PART |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Ok for temp occ. once fire/life/safety is ok for temp occ. nneds to install one exit sign and has request for lowering the occupant load. Will be using the kitchen area only.
|
FIRE-Final Inspection | 6/6/2012 | 6/6/2012 | 6/6/2012 | P | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the actual wall layout for the kitchen area. The sprinkler system requires modifications in the kitchen, dining, corridor and cooler areas. The smoke detectos appear to be overspaced. A fire alarm contractor needs to provide verificaiton the system met code when installed or provide modifications. The fire alarm system may need to be upgraded due to occupancy type and occupant load changes. Tim in plan review, David the owner and myself discussed this and I provided phone numbers to plan review.
|
BLD-Final | 6/1/2012 | 6/4/2012 | 6/4/2012 | P | CANC |
Tony Young
|
|
|
david Phone #: ###-####,, need trades 1st, no inspection
|