BLD-Final | 10/19/2012 | 10/19/2012 | 10/19/2012 | P | PASS |
Mike Jordan
|
|
|
Call for access Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
DOC - Permit Finaled | 10/19/2012 | 10/19/2012 | 10/19/2012 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 10/18/2012 | 10/18/2012 | 10/19/2012 | P | NR |
Mike Jordan
|
|
|
Call for access Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
BLD-Final | 10/16/2012 | 10/17/2012 | 10/17/2012 | A | FAIL |
Mike Jordan
|
|
|
Call for access Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Provide the equired energy cert and post. Provide the blower door test result and post or the 3rd. party inspection checklist report. Correction notice posted.
|
BLD-Final | 10/15/2012 | 10/16/2012 | 10/16/2012 | A | NR |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin. Electrical rough in inspection failed.
|
BLD-Final | 10/12/2012 | 10/15/2012 | 10/15/2012 | A | CANC |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by Rustin
|
BLD-Energy code compliance | 7/23/2012 | 7/24/2012 | 7/24/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by rustin
|
BLD-Framing/Rough-in | 7/24/2012 | 7/24/2012 | 7/24/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by rustin. All framing issues have been repaired.
|
BLD-Framing/Rough-in | 7/20/2012 | 7/23/2012 | 7/23/2012 | A | FAIL |
Mike Jordan
|
|
|
Phone #: 6088231 >> Inspection requested via mobile web by rustin. Have all interior shear walls completed on energy code inspection. Provide 2 straps at portal frame, fill double hangars, provide bottom and top plates at bonus room trusses. Strap stairwall at handrail. ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 7/10/2012 | 7/11/2012 | 7/11/2012 | P | FAIL |
Mike Jordan
|
|
|
Phone #: 2086088231 >> Inspection requested via mobile web by rustin ray. Exterior shaer nail ok. ok to cover exterior. Needs to provide portal frame as required on approved plans. Also will inspect interior shear wall on framing inspection.
|
BLD-Foundation | 6/12/2012 | 6/12/2012 | 6/12/2012 | P | PASS |
Mike Jordan
|
|
|
Ben Phone #: ###-####
|
BLD-Footing | 6/8/2012 | 6/8/2012 | 6/11/2012 | P | CANC |
Mike Jordan
|
|
|
Ben Phone #: ###-####
|
BLD-Footing | 6/11/2012 | 6/11/2012 | 6/11/2012 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ben Sears
|