BLD-Final | 6/13/2012 | 6/14/2012 | 6/14/2012 | P | PASS |
Tom Arcoraci
|
|
|
John Walsh Phone #: ###-####
|
FIRE-Final Inspection | 6/13/2012 | 6/14/2012 | 6/14/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/1/2012 | 6/4/2012 | 6/4/2012 | P | CANC |
Troy Cobbley
|
|
|
Josh Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|
FIRE-Final Inspection | 5/30/2012 | 5/30/2012 | 5/30/2012 | P | FAIL |
Troy Cobbley
|
|
|
Provide exit signs , as shown on the approved plans. The exit sign placement at the main exit is ok. Provide emergency lighting in the warehouse and office areas. Additional lighting is required at the north end of the warehouse. Provide single action, lever, hardware on all exterior exit doors as per the approved plans. Remove all dead bolts. The main exit door is ok to be keyed as long as the sticker "door to remain unlocked when buildign is occupied" is place at the exit. Provide singel action hardware on the interior doors at the pass through from the warehouse and the east office. Provide 2A, 10BC fire extinguishers with current inspection tags mounted 5' to 4" off of the finish floor. Provide two in the warehouse and one for the office area.
|