BLD-Final | 9/28/2012 | 9/28/2012 | 9/28/2012 | P | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 9/28/2012 | 9/28/2012 | 9/28/2012 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Conference | 9/26/2012 | 9/27/2012 | 9/27/2012 | A | FAIL |
Mike Jordan
|
|
|
steve - call for access Phone #: ###-####. Needs to provide the required energy cert and post and the blower door test result and post or the 3rd party airseal inspection report. Correction notice was posted.
|
BLD-Energy code compliance | 7/30/2012 | 7/31/2012 | 7/31/2012 | A | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 7/25/2012 | 7/26/2012 | 7/26/2012 | P | FAIL |
Mike Jordan
|
|
|
Steve Phone #: ###-####. Complete lateral bracing on T16 and T17 trusses. Encapsulate knee wall, west wall in kitchen. Provide header over doorway at masterbedroom. Ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 7/18/2012 | 7/19/2012 | 7/19/2012 | A | PASS |
Mike Jordan
|
|
|
Shear -- steve Phone #: ###-####. Exterior shear ok.
|
BLD-Foundation | 6/14/2012 | 6/15/2012 | 6/15/2012 | A | DONE |
Tom Arcoraci
|
|
|
Joe Phone #: ###-#### PWI
|
BLD-Footing | 6/13/2012 | 6/13/2012 | 6/13/2012 | P | PART |
Mike Jordan
|
|
|
Chris - late afternoon if possible Phone #: ###-####. No approved plan on site. Noted to contractor to provide approved plans on stem wall inspection. Also noted to contractor if they place concrete and their are any discrepencies noted from approved plans, contractor will repair or replace. Contractor proceeds at his own risk.
|