BLD-Final | 6/29/2012 | 6/29/2012 | 6/29/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin
|
DOC - Permit Finaled | 6/29/2012 | 6/29/2012 | 6/29/2012 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/29/2012 | 6/29/2012 | 6/29/2012 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 6/29/2012 | 6/29/2012 | 6/29/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/21/2012 | 6/21/2012 | 6/22/2012 | P | FAIL |
Troy Cobbley
|
|
|
The walls and ceiling system are still installed. Per Tim in plan review the approved plans, which are not on site, show all of these items to be removed. The space needs to match the plans or plan modifications need to be submitted showing these items to remain. I did test the smoke evac system which functioned correctly.
|
BLD-Final | 6/21/2012 | 6/21/2012 | 6/21/2012 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin Talked to Contractor....Difficulties in interpretation of scope of work......Need to discuss with plans examiner.
|
BLD-Conference | 5/31/2012 | 5/31/2012 | 5/31/2012 | P | DONE |
Mike Jordan
|
|
|
Joe Hudson Phone #: ###-####
|
BLD-Final | 5/24/2012 | 5/25/2012 | 5/25/2012 | P | NR |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
FIRE-Final Inspection | 5/24/2012 | 5/25/2012 | 5/25/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans for site inspection, provide sprinkler protection, mount the fire extinguisher, provide approved hardware. Additional items may be required when the city approved plans have been reviewed on site.
|