BLD-Final | 9/21/2012 | 9/21/2012 | 9/21/2012 | P | PASS |
Dave Hannah
|
|
|
TJ Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 8/28/2012 | 8/29/2012 | 8/29/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/22/2012 | 8/22/2012 | 8/23/2012 | P | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok for temp needs other trades to sign off for perm occ and finish installing doors and windows
|
FIRE-Final Inspection | 8/22/2012 | 8/22/2012 | 8/22/2012 | P | PART |
Troy Cobbley
|
|
|
A one week temporary occupancy was given with Scotts permission until the updated points map is provided, as discussed, and as requested on the previous inspection. Also the existing exit signs that are non-functional or barley functional need to be repaired. Also the main sprinkler has been previously set up to be partially close for the tamper switch to reset. This partial closed position can not be allowed and per verbal agreement will be addressed as well.
|
FIRE-Final Inspection | 8/20/2012 | 8/21/2012 | 8/21/2012 | A | FAIL |
Forrest France
|
|
|
Project related fire alarm permit final pending corrections, noted one EM light in need of repair, revise door hardware at two locations.
|
BLD-Other | 8/20/2012 | 8/20/2012 | 8/21/2012 | P | PART |
Dave Hannah
|
|
|
john Phone #: ###-####ceiling grid ok to cover
|
FIRE-Final Inspection | 8/16/2012 | 8/17/2012 | 8/17/2012 | P | NR |
Forrest France
|
|
|
Project related fire alarm permit is in review status, also need fire sprinkler permit final.
|
BLD-Framing/Rough-in | 7/26/2012 | 7/27/2012 | 7/27/2012 | A | PASS |
Dave Hannah
|
|
|
john Phone #: ###-####
|