BLD-Final | 12/28/2012 | 12/31/2012 | 12/31/2012 | A | PASS |
Tom Arcoraci
|
|
|
early am david
|
FIRE-Final Inspection | 12/28/2012 | 12/31/2012 | 12/31/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 12/27/2012 | 12/28/2012 | 12/28/2012 | P | NR |
Tom Arcoraci
|
|
|
late as possible//Dave Phone #: ###-####
|
FIRE-Final Inspection | 12/27/2012 | 12/28/2012 | 12/28/2012 | P | FAIL |
Troy Cobbley
|
|
|
Will be ok to final when the project related fire alarm permit is finaled
|
BLD-Final | 12/18/2012 | 12/18/2012 | 12/18/2012 | P | PART |
Mike Jordan
|
|
|
dave Phone #: ###-####. Temp occ granted for kitchen area only.
|
FIRE-Final Inspection | 12/17/2012 | 12/17/2012 | 12/18/2012 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with Scott Arellano's permission until the project related fire alarm and fire sprinkler permits are finaled and the life safety has been passed in all other areas outside of the kitchen. This approval is only for the kitchen area.
|
BLD-Final | 12/17/2012 | 12/18/2012 | 12/18/2012 | A | NR |
Mike Jordan
|
|
|
dave Phone #: ###-####. Moved to pm inspection.
|
BLD-Other | 12/14/2012 | 12/17/2012 | 12/17/2012 | P | PASS |
Mike Jordan
|
|
|
dave Phone #: ###-####. Ceiling grid ok to cover. verified fire treated wood behind curtains. Still need paperwork for curtains showing that they meet class A for set out construction.
|
FIRE-Final Inspection | 12/13/2012 | 12/14/2012 | 12/14/2012 | P | FAIL |
Troy Cobbley
|
|
|
For todays inspection I just verified that the kitchen area emergency lights and exit signs are functional. Per Dave and my agreement all permits will be called in for Monday morning for re-inspection.
|
FIRE-Conference | 12/7/2012 | 12/10/2012 | 12/10/2012 | A | DONE |
Troy Cobbley
|
|
|
Dave Dixon, hvac contractor, electrician and I had a conference about Dave's need for a temporary occupancy. I let him know that all inspections (alarm, sprinkler, hood suppression, life safety) would need to be completed and then he would need to contact Scott Arellano to make a request.
|
BLD-Conference | 12/7/2012 | 12/10/2012 | 12/10/2012 | A | DONE |
Mike Jordan
|
|
|
(9am?)Dave Dixon -- conf w/ele, fire, mike J., alan Phone #: ###-####
|
FIRE-Conference | 12/3/2012 | 12/4/2012 | 12/4/2012 | A | DONE |
Troy Cobbley
|
|
|
Dave Dixon wanted to know where to locate the knox key box. I deferred him to the fire dept. for locating the box.
|
BLD-Ceiling Grid Inspection | 12/3/2012 | 12/3/2012 | 12/3/2012 | P | NR |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Needs other trades.
|
FIRE-Conference | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | DONE |
Troy Cobbley
|
|
|
Dave and I went over the life safety notes and specifically the placement of the fire extinguishers.
|
BLD-Framing/Rough-in | 11/5/2012 | 11/6/2012 | 11/6/2012 | A | PART |
Tom Arcoraci
|
|
|
dave Phone #: ###-#### ok to cover south entrance west side is waiting for re submital to plan review
|
BLD-Conference | 11/2/2012 | 11/5/2012 | 11/5/2012 | A | PASS |
Mike Jordan
|
|
|
west wall exterior framing ok.
|
BLD-Other | 11/2/2012 | 11/2/2012 | 11/2/2012 | P | PART |
Mike Jordan
|
|
|
exterior steel stud framing west wall//Dave Phone #: ###-####. Need to verify approved set of structural drawings for exterior framing.
|
BLD-Energy code compliance | 10/23/2012 | 10/24/2012 | 10/24/2012 | A | PASS |
Mike Jordan
|
|
|
south wall only//Dave Dixon ###-####
|
BLD-Energy code compliance | 10/3/2012 | 10/4/2012 | 10/4/2012 | A | PART |
Jim Sly
|
|
|
Partial - Dixon Phone #: ###-#### South wall of Tech room....and North wall of Swag area... from N. W. corner of building ...going East to 1st door opening....OK.
|
BLD-Framing/Rough-in | 10/2/2012 | 10/3/2012 | 10/3/2012 | A | PASS |
Tom Arcoraci
|
|
|
dave - early if possible Phone #: ###-####east wall ok kit ok west corners ok
|
BLD-Energy code compliance | 9/19/2012 | 9/19/2012 | 9/19/2012 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 9/19/2012 | 9/19/2012 | 9/19/2012 | A | PASS |
Mike Jordan
|
|
|
Dave - ###-####. West perimeter wall ok.
|
BLD-Framing/Rough-in | 9/17/2012 | 9/18/2012 | 9/18/2012 | A | PART |
Mike Jordan
|
|
|
partial framing//Dave Dixon Phone #: ###-####. Interior steel stud framing for furout ot west exterior wall. ok to insulate.
|
BLD-Energy code compliance | 9/10/2012 | 9/11/2012 | 9/11/2012 | A | PASS |
Mike Jordan
|
|
|
Dave Dixon Phone #: ###-####. North and east exterior fur out walls, R-11 ok.
|
BLD-Concrete | 9/5/2012 | 9/6/2012 | 9/6/2012 | A | PASS |
Mike Jordan
|
|
|
Dave Dixon Phone #: ###-####. Column pad footings on gridline 4 at grids E and F ok. Will have special inspection.
|
BLD-Energy code compliance | 9/6/2012 | 9/6/2012 | 9/6/2012 | A | PASS |
Mike Jordan
|
|
|
Dave Dixon Phone #: ###-####. R-11 insulation at fur out wall, east wall line ok.
|
BLD-Framing/Rough-in | 9/4/2012 | 9/5/2012 | 9/5/2012 | A | PART |
Mike Jordan
|
|
|
dave - partial Phone #: ###-####. Interior steel stud wall framing for restrooms, coolers, mech room and storage roooms in "back of house" south and west furred perimeter walls and one wall in kitchen ok.
|