Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD12-01688
StatusFinaled
Name PACIFIC SIERRA CONSTRUCTION
Site Address 731 N TROUTNER WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of 1376s.f. to an existing 2462s.f. 1-story single family dwelling. The addition will be a 688s.f. basement with 1-bedroom, 1-bathroom and a bonus room ( constructed under (BLD02-00523). The main level addition will create 2-bedroom, laundry room and bathroom with minor modifications to the hallway walls. There will be a new non bearing partition wall placed in the rear of the garage to create a new coat / mud room. R-1B ok per Jenifer Tomlinsen. This dwelling falls under the hillside and Wildland Urban Interface ordainances. Class "A" roofing materials, protected sofits anf flame resistant exterior wall finishes. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. Separate electrical, plumbing, mechanical and ESC permits are required. All per theapproved plans as marked Energy prescriptive componant approach (no RESCheck) Engineering and engineers details along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/12/201212/12/201212/12/2012PPASS
DetailsDave Hannah
Scott Phone #: ###-####
DOC - Permit Finaled12/12/201212/12/201212/12/2012PPASS
DetailsDave Hannah
BLD-Wall Bracing9/24/20129/24/20129/24/2012PPASS
DetailsDave Hannah
scott Phone #: ###-####
BLD-Other9/17/20129/18/20129/18/2012PPASS
DetailsDave Hannah
soffit with fire reated sheetrock///Scott Phone #: ###-####
BLD-Energy code compliance9/18/20129/18/20129/18/2012PPASS
DetailsDave Hannah
scott Phone #: ###-####
BLD-Framing/Rough-in9/13/20129/14/20129/14/2012APART
DetailsDave Hannah
Scott Phone #: ###-#### ok to insulate but ext shear still not right needs hold downs nailing and straping
BLD-Framing/Rough-in9/12/20129/12/20129/12/2012PNR
DetailsDave Hannah
scott Phone #: ###-####
BLD-Framing/Rough-in9/11/20129/12/20129/12/2012AFAIL
DetailsDave Hannah
scott Phone #: ###-#### c/n on site do not cover int or ext walls
BLD-Footing7/31/20128/1/20128/1/2012APASS
DetailsDave Hannah
Jeff Phone #: ###-####
BLD-Footing7/26/20127/27/20127/27/2012APART
DetailsDave Hannah
JEFF Phone #: ###-#### ok to pour ftg on section under ext house
BLD-Footing7/25/20127/25/20127/26/2012PFAIL
DetailsDave Hannah
around 2--wants to pour at noon//Jeff Phone #: ###-#### set backs are to close
BLD-Footing7/24/20127/25/20127/25/2012ANR
DetailsDave Hannah
late am--wants to pour at noon//Jeff Phone #: ###-####