BLD-Final | 6/27/2013 | 6/28/2013 | 6/28/2013 | A | PASS |
Jim Storey
|
|
|
mech permit now final and attached. meet B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
DOC - Permit Finaled | 6/28/2013 | 6/28/2013 | 6/28/2013 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/7/2012 | 12/10/2012 | 12/10/2012 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes pending mech insp. and permit.
|
FIRE-Final Inspection | 12/5/2012 | 12/6/2012 | 12/7/2012 | A | PASS |
Forrest France
|
|
|
|
BLD-Final | 12/5/2012 | 12/6/2012 | 12/7/2012 | A | DEFR |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
FIRE-Final Inspection | 10/30/2012 | 11/1/2012 | 11/1/2012 | A | CANC |
Forrest France
|
|
|
The fire alarm and sprinkler permits have been final in the pump / chiller closet. Jim will be out on Thursday to final the ceiling grid. Keeping you in the loop. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
BLD-Final | 10/30/2012 | 11/1/2012 | 11/1/2012 | A | NR |
Jim Storey
|
|
|
Meet in 25 then head out to the TEM lab. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Conference | 10/1/2012 | 10/3/2012 | 10/3/2012 | A | PART |
Jim Storey
|
|
|
Meet in B25. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes need smoke and flame dev. rating for foam wall covering.
|