Permit Information
Permit NumberBLD12-01789
StatusFinaled
Name WESTWOOD CONTRACTORS INC
Site Address 350 N MILWAUKEE ST Unit: 117
Project NameH&M Clothiers
Customer Number 
ePlanReviewYes
Description
(H&M) Boise Towne Square Major TI Type IIB construction for new retail store. This building is fully sprinklered. Work includes the build-out of existing lease spaces by creating a new storefront system, interior walls, flooring, interior wall finishes, new drywall, roll down security grill at mall side opening, display windows and SAT ceiling, new light fixture's throughout, accessible dressing room & toilet room, interior display fixture's; electrical, mechanical, plumbing, sprinkler and alarm system work. All per reviewed drawings, with the plan review report and with all applicable codes and ordinances. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks and require separate submittals and permits. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/19/201211/20/201211/20/2012PPASS
DetailsMike Jordan
rich Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection11/19/201211/19/201211/19/2012PPASS
DetailsForrest France
Fire life safety and project related alarm work okay for final per T. Cobbley.
BLD-Final11/19/201211/19/201211/19/2012PFAIL
DetailsMike Jordan
Rich Phone #: ###-####. manual lever for roll up gate was non operational.
FIRE-Final Inspection11/15/201211/16/201211/16/2012AFAIL
DetailsTroy Cobbley
Life safety will be ok to pass when the shell core permit is finaled, panic hardware installed on the rear exit door and the project related fire alarm permit is finaled.
BLD-Final11/15/201211/16/201211/16/2012ANR
DetailsMike Jordan
rich Phone #: ###-####. Needs to repair door hardware, get project related electrical and fire alarm permits finaled as well as shell and core permit.
BLD-Ceiling Grid Inspection11/13/201211/13/201211/13/2012PPASS
DetailsJim Sly
Rich Phone #: ###-#### Grid OK
FIRE-Conference11/13/201211/13/201211/13/2012PDONE
DetailsTroy Cobbley
With Scott Arellano's permission the stocking of the store is approved based on the existing fire sprinkler system in all areas to be stocked is functional and that the fire alarm permit has been submitted on. Also the contractor has agreed to supply security/fire watch for the "afterhours". Two rooms will not have the ceiling installed till a later date. These two rooms are electrical service rooms and it was agreed that there is to be no storage in these areas and that they are to be accessed for construction only.
BLD-Conference11/8/201211/9/201211/9/2012PDONE
DetailsJim Sly
Rich - (temp) Phone #: ###-#### Rich to contact Fire inspector for approval to move in fixtures and merchandise.
FIRE-Conference11/8/201211/9/201211/9/2012PDONE
DetailsTroy Cobbley
Rich and I discussed the requirements for him to set up display racks and to begin stocking the store. The fire alarm and fire sprinkler permits need to be completed prior to setup and stocking. A fire alarm permit has not been submitted for yet and not all of the fire sprinkler rough-in has been completed.
BLD-Framing/Rough-in10/19/201210/19/201210/19/2012PPASS
DetailsMike Jordan
Ceiling cover inspection please-Rich Overland Phone #: ###-#### room 4 hardlids ok.
BLD-Other10/16/201210/16/201210/16/2012PPASS
DetailsMike Jordan
rich Phone #: ###-####
BLD-Framing/Rough-in10/10/201210/11/201210/11/2012PPASS
DetailsTom Arcoraci
rich Phone #: ###-#### int walls and ceiling ok,ext wall at south side ok
BLD-Other10/1/201210/2/201210/2/2012PPASS
DetailsTom Arcoraci
partial ceiling//Rich Overland Phone #: ###-#### two middle rooms ok
BLD-Other9/27/20129/28/20129/28/2012PPART
DetailsMike Jordan
rich Phone #: ###-####. Hardlids at grids 12 to 14.
BLD-Framing/Rough-in9/24/20129/25/20129/25/2012PPART
DetailsMike Jordan
Rich Overland Phone #: ###-####. INterior steel stud framed walls from gridline 10 to 14.9.
FIRE-Conference9/5/20129/6/20129/6/2012ADONE
DetailsTroy Cobbley
Don and I discussed an early start agreement. I deferred him to Tim Frost.