DOC - Permit Finaled | | | 4/22/2013 | | DONE |
|
|
|
|
BLD-Final | 1/10/2013 | 1/11/2013 | 1/11/2013 | P | PASS |
Dave Hannah
|
|
|
please call so i can meet onsite Phone #: ###-#### >> Inspection requested via web by Tony Dondero
|
FIRE-Final Inspection | 1/10/2013 | 1/11/2013 | 1/11/2013 | A | PASS |
Forrest France
|
|
|
Correction items verified. Fire life safety completed satisfactory.
|
FIRE-Final Inspection | 1/3/2013 | 1/4/2013 | 1/4/2013 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy for the new construction area was given with scott arellano's permission until the project related fire alarm permit has been re-issued. Life safety items appeared ok.
|
FIRE-Final Inspection | 1/3/2013 | 1/3/2013 | 1/3/2013 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the project related fire alarm permit has been addressed.
|
BLD-Final | 1/3/2013 | 1/3/2013 | 1/3/2013 | P | CANC |
Dave Hannah
|
|
|
Please call befor so I can meet onsite. Tony Dondero: EKC Construction Phone #: ###-#### >> Inspection requested via web by Tony Dondero
|
BLD-Ceiling Grid Inspection | 12/28/2012 | 12/28/2012 | 12/28/2012 | P | PASS |
Dave Hannah
|
|
|
tony - call prior to going Phone #: ###-####
|
FIRE-Conference | 12/10/2012 | 12/10/2012 | 12/10/2012 | A | DONE |
Forrest France
|
|
|
|
BLD-Framing/Rough-in | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PASS |
Dave Hannah
|
|
|
call before to meet//Tony Phone #: ###-####
|