BLD-Conference | 1/25/2013 | 1/25/2013 | 1/25/2013 | P | DONE |
Mike Jordan
|
|
|
Left message with chris steed regarding project. the life/safety issues still need to be corrected prior to finaling job. Building final is ok pending fire.
|
BLD-Final | 9/6/2012 | 9/7/2012 | 9/7/2012 | P | PART |
Mike Jordan
|
|
|
Please call prior to arrival 30min - Tim Phone #: ###-####. Will be ok for doc final once fire sprinlkler and life/safety have finaled.
FEES DUE TO BENCH SEWER PRIOR TO FINAL INSP. see Rita
|
FIRE-Conference | 9/5/2012 | 9/5/2012 | 9/5/2012 | A | DONE |
Forrest France
|
|
|
On site discussion with contractor regarding fire life safety inspection items, exit sign locations, an existing roll up fire door to be disabled provided documentation of approval is aquired.
|