BLD-Final | 12/11/2012 | 12/12/2012 | 12/12/2012 | A | PASS |
Mike Jordan
|
|
|
cameron Phone #: ###-####
|
DOC - Permit Finaled | 12/12/2012 | 12/12/2012 | 12/12/2012 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 12/10/2012 | 12/11/2012 | 12/11/2012 | P | FAIL |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. Install vapor barrier in crawl space an r-30 insulation under floor.
|
BLD-Wall Bracing | 10/24/2012 | 10/25/2012 | 10/25/2012 | P | PASS |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. Interior wall bracing ok.
|
BLD-Energy code compliance | 10/23/2012 | 10/24/2012 | 10/24/2012 | A | PASS |
Mike Jordan
|
|
|
cameron Phone #: ###-####
|
BLD-Framing/Rough-in | 10/19/2012 | 10/22/2012 | 10/22/2012 | P | PASS |
Mike Jordan
|
|
|
Cameron Phone #: ###-####
|
BLD-Framing/Rough-in | 10/18/2012 | 10/19/2012 | 10/19/2012 | P | NR |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. Needs mech. rough in inspection.
|
BLD-Framing/Rough-in | 10/8/2012 | 10/9/2012 | 10/9/2012 | A | PART |
Jim Sly
|
|
|
shear inspection please--Conference with gc also please--Cameron Phone #: ###-#### - call 30 mins prior to meet Ext.shear nailing...OK
|
BLD-Foundation | 8/30/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Tom Arcoraci
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 8/30/2012 | 8/30/2012 | 8/30/2012 | P | PASS |
Mike Jordan
|
|
|
cameron Phone #: ###-####
|