BLD-Final | 12/17/2012 | 12/18/2012 | 12/18/2012 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by kevin debelloy
|
DOC - Permit Finaled | 12/18/2012 | 12/18/2012 | 12/18/2012 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 12/17/2012 | 12/18/2012 | 12/18/2012 | A | PASS |
Forrest France
|
|
|
Correction items verified for completion. Fire life safety passed.
|
FIRE-Final Inspection | 12/11/2012 | 12/12/2012 | 12/12/2012 | A | FAIL |
Forrest France
|
|
|
Items noted include; provide approved plans and permit documents on site, fire extinguishers are overdue annual certification, remove tape and paper covering the duct detectors.
|
BLD-Final | 12/11/2012 | 12/12/2012 | 12/12/2012 | P | NR |
Jim Storey
|
|
|
Please call Wayne at ###-#### 20 minutes before arrival Phone #: ###-#### >> Inspection requested via web by kevin debelloy failed by fire
|
BLD-Final | 12/11/2012 | 12/11/2012 | 12/11/2012 | P | DEFR |
Jim Storey
|
|
|
Please call Wayne at ###-#### 20 minutes before arrival Phone #: ###-#### >> Inspection requested via web by kevin debelloy// need fre final
|
BLD-Framing/Rough-in | 10/30/2012 | 10/30/2012 | 10/30/2012 | P | PASS |
Mike Jordan
|
|
|
Could inspector give me a call aprrox. 30 minutes before their arrival so I can meet them on the jobsite Please. Thanks Kevin deBelloy ###-#### Phone #: ###-#### >> Inspection requested via web by kevin debelloy
|