BLD-Final | 12/19/2012 | 12/20/2012 | 12/20/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Cori Piccione. ok for perm occ.
|
FIRE-Final Inspection | 12/19/2012 | 12/20/2012 | 12/20/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Conference | 11/28/2012 | 11/29/2012 | 11/29/2012 | P | CANC |
Troy Cobbley
|
|
|
Final inspection is what was actually needed.
|
BLD-Other | 11/25/2012 | 11/28/2012 | 11/28/2012 | P | PART |
Tony Young
|
|
|
I need to get a partial occupancy inspection Phone #: ###-#### >> Inspection requested via web by Cori Piccione,, temp occ. on south side ok pending others
|
FIRE-Final Inspection | 11/28/2012 | 11/28/2012 | 11/28/2012 | P | PART |
Troy Cobbley
|
|
|
A 30 day temporary occupancy was given with Scott and Jason's permission until the remaining portion of the tenant work is completed and finaled. The finished side of the tenant space is to be secured from the "construction side" of the tenant space.
|
FIRE-Conference | 11/28/2012 | 11/28/2012 | 11/28/2012 | A | FAIL |
Troy Cobbley
|
|
|
Mount and tag fire extinguisheres as discussed. Provide single action hardware as per the Accessibility notes on sheet A0.0. Finish all construction as shown on the approved drawings.
|
BLD-Framing/Rough-in | 11/3/2012 | 11/5/2012 | 11/5/2012 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Cori Piccione
|