BLD-Final | 10/25/2012 | 10/26/2012 | 10/26/2012 | A | PASS |
Tony Young
|
|
|
bill Phone #: ###-####
|
BLD-Final | 10/25/2012 | 10/25/2012 | 10/25/2012 | P | NH |
Tony Young
|
|
|
bill Phone #: ###-####,,, called left a messege,, doors locked
|
FIRE-Final Inspection | 10/25/2012 | 10/25/2012 | 10/25/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Panic hardware has been installed on the main exit as required per the city approved plans.
|
BLD-Final | 10/23/2012 | 10/24/2012 | 10/24/2012 | P | NR |
Tony Young
|
|
|
William Phone #: ###-####,, needs f/l/s 1st
|
FIRE-Final Inspection | 10/23/2012 | 10/24/2012 | 10/24/2012 | A | FAIL |
Troy Cobbley
|
|
|
All items corrected except for the panic hardware at the main exit.
|
FIRE-Final Inspection | 10/18/2012 | 10/19/2012 | 10/19/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide panic hardware on the main exit as per the approved plans, repair all exit/emergency lights, one of the bounce houses is blocking upright sprinkler coverage and is not maintaining the minimum 18" clearance below the sprinklers, per scott arellano the second fully enclosed bounce house is ok not to be provided interior sprinkler coverage, provide occupant load sign for "186", provide single action hardware for the office door as discussed, provide verification of annual inspection for the existing fire sprinkler system.
|