BLD-Final | 1/31/2013 | 2/1/2013 | 2/1/2013 | P | PASS |
Dave Hannah
|
|
|
nathan Phone #: ###-####
|
FIRE-Final Inspection | 1/30/2013 | 1/31/2013 | 1/31/2013 | A | PASS |
Forrest France
|
|
|
Noted correction items verified for completion. Scope of permit work finished with the exception of the electrical permit yet to be finaled.
|
FIRE-Conference | 1/29/2013 | 1/29/2013 | 1/29/2013 | P | DONE |
Forrest France
|
|
|
|
FIRE-Final Inspection | 1/28/2013 | 1/28/2013 | 1/28/2013 | P | FAIL |
Forrest France
|
|
|
Missing EM lighting at three locations, revise hardware at the cooler door, cover open electrical junction boxes, final project related electrical permit, complete finishes and housekeeping etc.
|
BLD-Framing/Rough-in | 11/21/2012 | 11/21/2012 | 11/21/2012 | P | PART |
Tony Young
|
|
|
NATHAN Phone #: ###-####,, ceiling area
|
BLD-Conference | 11/7/2012 | 11/7/2012 | 11/7/2012 | P | PART |
Dave Hannah
|
|
|
Nathan Phone #: ###-#### needs to submit plans if they are going to build a mezzanen
|