(GROVE HOTEL – INTERIOR DEMO – 15 th / 14 th / 13 th floors) ****NO NEW CONSTRUCTION ALLOWED UNDER THIS PERMIT**** This permit is to perform demo work only. Scope of work includes removal of non-bearing interior partition walls, removal of interior finishes, removal of some existing outlets and wiring back to the box or properly terminated above ceiling line, and removal of some existing light fixtures. This permit is to address flood damage from a sprinkler head that was deployed for a small fire. This work is considered necessary to assess damage. Tom Gainer with the Boise City Fire Dept. will periodically verify all emergency systems are in place and operable. A separate permit is required to make all repairs necessary. All building sprinkler, alarm, and smoke evacuation systems must be maintained throughout the demo and after demo is completed. ****NO NEW CONSTRUCTION ALLOWED UNDER THIS PERMIT****
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference1/17/20131/24/20131/24/2013APASS
DetailsTony Young
Check on status of 5 day NOV issued on the 17th.
no new work appears to be going on,, just demo and maybe some fire caulking,, no one around
BLD-Conference1/17/20131/17/20131/17/2013AFAIL
DetailsBob Archibald
Issued a 5 day NOV to manager, John Cunningham, and emphazied the need to take immediate corrective action to repair the stairways and corridors (floors 13 thru 15).
BLD-Conference1/15/20131/15/20131/15/2013AFAIL
DetailsDave Hannah