BLD-Final | 7/31/2013 | 7/31/2013 | 7/31/2013 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 7/31/2013 | 7/31/2013 | 7/31/2013 | P | PASS |
Mike Jordan
|
|
|
firewalls were completed. ok for perm occ.
|
BLD-Final | 1/29/2013 | 1/30/2013 | 1/30/2013 | P | PART |
Mike Jordan
|
|
|
Around 2:30 if possible please--Lance or ###-#### Phone #: ###-####. ok for temp occ. Will be ok for perm. occ. once the buildings in back have the fire walls completed.
|
FIRE-Final Inspection | 1/25/2013 | 1/28/2013 | 1/28/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 1/23/2013 | 1/25/2013 | 1/25/2013 | P | FAIL |
Troy Cobbley
|
|
|
Remove the dead bolts from all of the warehouse exit doors, lower the fire extinguisher in the south end of the warehouse, provide 2A,10BC fire extinguishers (with current inspection tags) for the upper level and the mezzanine.
|