Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD12-03141
StatusFinaled
Name SCOTT SCHOENHERR
Site Address 408 E PARKCENTER BLVD Unit: 350
Project NamePACIFIC SOURCE
Customer Number 
ePlanReviewYes
Description
(PACIFIC SOURCE - River Quarry Bldg "B" - Ste#350) Permit is to separate off and remodel a 8,200 square foot office area on the third floor of an existing building. The area left over after this remodel was permitted for “RAFANELLI AND NAHAS” under BLD12-03140. Approval contingent upon adhering to the approved plans on file. Work to include: [construction of interior non-bearing walls to create: this area as a stand-alone tenant area, an alcove for the new corridor doors, four new office, two large open office areas, a storage room, and an IT closet], new doors / accessible hardware, new break room sink, new light switching, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/24/20134/25/20134/25/2013APART
DetailsJim Storey
Justin Phone #: ###-#### ele c/n work will be completed in less than 2 wk resch ok
BLD-Final4/24/20134/24/20134/24/2013PCANC
DetailsJim Storey
please call 30min prior - justin Phone #: ###-####
BLD-Final4/23/20134/24/20134/24/2013ADEFR
DetailsJim Storey
please call 30min prior - justin Phone #: ###-#### eed to finsh insp ele
BLD-Aging Inspection3/25/20133/25/20133/25/2013 PEND
DetailsJim Storey
ele sign off
BLD-Final1/22/20131/23/20131/23/2013PPASS
DetailsTom Arcoraci
FIRE-Final Inspection1/22/20131/23/20131/23/2013APASS
DetailsTroy Cobbley
Life safety passed. The emergency light just inside the tenant entrance to be repaired and demostrated to the building inspector prior to final sign off.
BLD-Final1/22/20131/22/20131/22/2013PNR
DetailsTom Arcoraci
justin Phone #: ###-####
FIRE-Final Inspection1/15/20131/16/20131/16/2013ANR
DetailsForrest France
Missing ceiling tile, doors and hardware, incomplete finishes, etc.
BLD-Other1/11/20131/14/20131/14/2013APASS
DetailsJim Storey
justin Phone #: ###-####
BLD-Ceiling Grid Inspection1/8/20131/9/20131/9/2013PPASS
DetailsJim Storey
dustin Phone #: ###-#### east half ok
BLD-Framing/Rough-in12/17/201212/18/201212/18/2012APART
DetailsJim Storey
Brent Phone #: ###-#### framing ok to cover upon ele and plm aproval.