BLD-Final | 7/24/2013 | 7/25/2013 | 7/25/2013 | A | PASS |
Jim Sly
|
|
|
mike Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 7/25/2013 | 7/25/2013 | 7/25/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/23/2013 | 7/24/2013 | 7/24/2013 | P | PEND |
Dave Hannah
|
|
|
Mike Phone #: ###-#### house is ok but need energy certs for elec panel
|
BLD-Energy code compliance | 4/25/2013 | 4/26/2013 | 4/26/2013 | P | PASS |
Dave Hannah
|
|
|
mike Phone #: ###-####
|
BLD-Framing/Rough-in | 4/18/2013 | 4/19/2013 | 4/19/2013 | P | PART |
Tony Young
|
|
|
Mike Phone #: ###-####,, need egress out of master bedroom,, point loads,, toe nail hangers,,etc ,, met with framer and contractor,, ok to insulate
|
BLD-Wall Bracing | 4/9/2013 | 4/10/2013 | 4/10/2013 | A | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####. 1st and 2nd. story exterior walls only.
|
BLD-Foundation | 2/22/2013 | 2/22/2013 | 2/22/2013 | P | PASS |
Dave Hannah
|
|
|
Robert Phone #: ###-####
|
BLD-Footing | 2/20/2013 | 2/21/2013 | 2/21/2013 | A | PASS |
Dave Hannah
|
|
|
MIKE Phone #: ###-####
|