BLD-Final | 11/25/2013 | 11/25/2013 | 11/25/2013 | P | PASS |
Tony Young
|
|
|
Rick Phone #: ###-####,, ok for a c of o
|
BLD-Final | 10/17/2013 | 10/29/2013 | 10/29/2013 | A | PEND |
Tony Young
|
|
|
call before // Tim Phone #: ###-####,, still needs a landing
|
BLD-Final | 10/14/2013 | 10/15/2013 | 10/17/2013 | A | PART |
Tony Young
|
|
|
call before // Tim Phone #: ###-####,, temp occ.
|
BLD-Final | 10/14/2013 | 10/14/2013 | 10/15/2013 | P | PEND |
Tony Young
|
|
|
call before // Tim Phone #: ###-####
|
BLD-Final | 10/9/2013 | 10/10/2013 | 10/14/2013 | A | PART |
Tony Young
|
|
|
call before // Tim Phone #: ###-####,, ok pending others,, needs a landing on rear door,, will pour concrete
|
FIRE-Final Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Conference | 10/9/2013 | 10/9/2013 | 10/9/2013 | P | PART |
Tony Young
|
|
|
call before // Tim Phone #: ###-####,, walk through
|
FIRE-Final Inspection | 10/8/2013 | 10/8/2013 | 10/8/2013 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is given with scotts permission until fire dept access signage is provided.
|
BLD-Energy code compliance | 9/4/2013 | 9/5/2013 | 9/5/2013 | A | DONE |
Tony Young
|
|
|
gary Phone #: ###-####
|
BLD-Energy code compliance | 9/4/2013 | 9/4/2013 | 9/4/2013 | P | PASS |
Tony Young
|
|
|
gary Phone #: ###-####
|
BLD-Energy code compliance | 9/3/2013 | 9/4/2013 | 9/4/2013 | A | PASS |
Tony Young
|
|
|
late morning - Rick Phone #: ###-####
|
BLD-Energy code compliance | 8/30/2013 | 9/3/2013 | 9/3/2013 | A | CANC |
Tony Young
|
|
|
Phone #: ###-####,, nr
|
BLD-Framing/Rough-in | 8/30/2013 | 8/30/2013 | 8/30/2013 | P | PART |
Tony Young
|
|
|
Tim; Phone #: ###-####,, need point load studs,, straps,, ok to insulate
|
BLD-Other | 6/17/2013 | 6/19/2013 | 6/19/2013 | A | PASS |
Tony Young
|
|
|
exterior wall shear nailing inspection, for cover. Steed Supt. Gary Band ###-#### Framing Cont. Will Schiebe ###-#### Phone #: ###-#### >> Inspection requested via web by Gary Band,, ext shear ok
|
BLD-Conference | 6/4/2013 | 6/5/2013 | 6/5/2013 | A | PEND |
Tony Young
|
|
|
Framing contractor William Scheibe would like to discuss connection requirements and shear. Rescheduled for a.m.. Ph #''s William Scheibe---- ###-#### Gary Band (steed)- ###-#### Phone #: ###-#### >> Inspection requested via web by Gary Band,, will get architect to answer ?s
|
BLD-Conference | 6/4/2013 | 6/4/2013 | 6/4/2013 | P | CANC |
Tony Young
|
|
|
structural wood framers have several questions regarding allowable connections and shear construction Steed Supt. Gary Band@ ###-#### or framing contractor, William Scheibe ###-#### Phone #: ###-#### >> Inspection requested via web by Gary Band Inspection cancelled from web by: Gary Band
|