BLD-Conference | 4/2/2014 | 4/2/2014 | 4/2/2014 | P | DONE |
Dave Hannah
|
|
|
zack Phone #: ###-####
|
BLD-Framing/Rough-in | 10/25/2013 | 10/28/2013 | 10/28/2013 | A | PASS |
Tom Arcoraci
|
|
|
ZACH Phone #: ###-#### ok after elec inspection
|
BLD-Foundation | 10/15/2013 | 10/15/2013 | 10/15/2013 | P | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Footing | 10/14/2013 | 10/14/2013 | 10/14/2013 | P | PASS |
Jim Storey
|
|
|
Pouring around 2 - Jeff Phone #: ###-####
|
BLD-Energy code compliance | 10/4/2013 | 10/7/2013 | 10/9/2013 | A | PASS |
Dave Hannah
|
|
|
zach Phone #: ###-####
|
BLD-Framing/Rough-in | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PART |
Jim Sly
|
|
|
Zack Phone #: ###-#### spot check for fireblocking at all basement walls next to foundation wall, drop ceilings, and concealed space (chase) 1st floor. Check for air seal.
|
BLD-Wall Bracing | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | PASS |
Tony Young
|
|
|
zach Phone #: ###-####
|
BLD-Framing/Rough-in | 7/15/2013 | 7/15/2013 | 7/15/2013 | P | PART |
Tony Young
|
|
|
Zach Phone #: ###-####,, conf and shear only,, ok to cover exterior
|
BLD-Conference | 5/8/2013 | 5/9/2013 | 5/9/2013 | A | PASS |
Tom Arcoraci
|
|
|
zach Phone #: ###-#### ok to install headers where non existed as long as opening does not change 24 oc ok for rear wall
|
BLD-Concrete | 5/1/2013 | 5/1/2013 | 5/1/2013 | P | PASS |
Dave Hannah
|
|
|
Brent Phone #: ###-####
|
BLD-Footing | 4/30/2013 | 4/30/2013 | 5/1/2013 | P | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Footing | 4/22/2013 | 4/22/2013 | 4/22/2013 | P | PASS |
Dave Hannah
|
|
|
brent Phone #: ###-####
|
BLD-Foundation | 4/19/2013 | 4/19/2013 | 4/19/2013 | P | FAIL |
Dave Hannah
|
|
|
Jeff Phone #: ###-#### not per plans
|