DOC - Permit Finaled | | | 6/21/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
finaled and letter of compliance issued 3/2/17
|
BLD-Final | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PASS |
Jim Sly
|
|
|
Robert Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | CANC |
Jim Sly
|
|
|
Robert Phone #: ###-####
|
FIRE-Final Inspection | 2/28/2017 | 3/1/2017 | 3/1/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Conference | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | DONE |
Jim Sly
|
|
|
Robert Phone #: ###-####
|
FIRE-Final Inspection | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | FAIL |
Troy Cobbley
|
|
|
Remove the thumbturn dead bolt from the main exit, keyed is ok and provide the sticker as discussed. Provide the exit sign as discussed at the main exit door. Repair the exit sign at the rear door and remove the thumbturn deadbolt as discussed. Contact plan review and see what they need for updated floor plans.
|
BLD-Conference | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | NR |
Jim Sly
|
|
|
call Robert prior to going out. He would like a conference before his final. Phone #: ###-#### Need Ele 13-00800 and Fire Life finals.
|
BLD - Request for Extension | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | DONE |
Jim Sly
|
|
|
Robert-please call to meet Phone #: ###-#### WIP Slow progress.....but working.......
|
BLD-Aging Inspection | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | DONE |
Jim Sly
|
|
|
Bob-please call with results Phone #: ###-#### WIP.
|
BLD-Framing/Rough-in | 7/30/2015 | 7/31/2015 | 7/31/2015 | P | PART |
Jim Sly
|
|
|
Robert Phone #: ###-#### Select walls ok
|
BLD-Framing/Rough-in | 5/12/2015 | 5/13/2015 | 5/13/2015 | A | PART |
Jim Sly
|
|
|
Robert Phone #: ###-#### Select walls OK
|
BLD-Conference | 2/27/2015 | 2/27/2015 | 2/27/2015 | P | DONE |
Jim Sly
|
|
|
Robert Phone #: ###-#### WIP.
|
BLD-Conference | 7/10/2014 | 7/10/2014 | 7/10/2014 | P | DONE |
Jim Sly
|
|
|
Robert-wuold like as early as possible-please call with a meet time Phone #: ###-####
|
BLD-Final | 3/20/2014 | 3/20/2014 | 3/20/2014 | P | NR |
Jim Sly
|
|
|
WIP.
|
BLD-Conference | 1/30/2014 | 1/31/2014 | 1/31/2014 | A | DONE |
Jim Sly
|
|
|
robert - after 10:00 please Phone #: ###-#### WIP.
|
BLD-Framing/Rough-in | 4/4/2013 | 4/5/2013 | 4/5/2013 | P | PART |
Jim Sly
|
|
|
Robert Peck Phone #: ###-#### Phase 1.......OK
|
BLD-Framing/Rough-in | 1/15/2013 | 1/16/2013 | 1/16/2013 | P | NR |
Jim Sly
|
|
|
robert Phone #: ###-####
|