BLD-Final | 12/9/2015 | 12/9/2015 | 12/9/2015 | A | PASS |
Jim Storey
|
|
|
final ok
|
BLD-Final | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PART |
Jim Storey
|
|
|
temp ok pending mech
|
FIRE-Final Inspection | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | PASS |
Jim Page
|
|
|
Associated FIR permits with this BLD permit complete, life fire safety passed/complete
|
FIRE-Final Inspection | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | PART |
Thomas Walsh
|
|
|
Fire and life-safety inspection for garage 2 - elevator lobby and resident storage areas only. Actual parking garage is not part of ths TCO. Exit signs and EM lighting tested OK. Area od Refuge comm. system for this story needs work, not communicating with main panel. Will retest this device with phases F&G wings. Doors from exit stairwell and elevator lobby into the parking garage shall be signed "No Admittance", or similar verbiage to prevent residents from entering the parking garage.
|
FIRE-Final Inspection | 10/5/2015 | 10/6/2015 | 10/6/2015 | P | PART |
Thomas Walsh
|
|
|
Fire Life safety inspection of a small portion of garage 2, near the elevator lobby and portion of the storage room under wing E. Exit signs and emeregency lighting not tested this visit. Garage doors from the elevator lobby and stairwell to be signed prohibiting resident access to this garage, which is not ready for use at this time.
|
BLD-Final | 7/8/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Jim Storey
|
|
|
Kc Phone #: ###-####
|
BLD-Foundation | 4/30/2014 | 4/30/2014 | 4/30/2014 | P | PART |
Jim Storey
|
|
|
JC Phone #: ###-#### placed with si pending reports.
|
BLD-Foundation | 4/9/2014 | 4/10/2014 | 4/10/2014 | A | PART |
Dave Hannah
|
|
|
JC Phone #: ###-#### walked project with JC MTI on site covering spec inspection
|
BLD-Concrete | 3/26/2014 | 3/27/2014 | 3/27/2014 | P | PASS |
Jim Storey
|
|
|
3pm // basement walls // JC Phone #: ###-#### si on site
|
BLD-Footing | 3/12/2014 | 3/12/2014 | 3/12/2014 | P | PASS |
Jim Storey
|
|
|
pouring at 3 - jc Phone #: ###-#### ele conduit ok to cover as well as pad ft.
|
BLD-Footing | 3/5/2014 | 3/5/2014 | 3/5/2014 | P | PART |
Jim Storey
|
|
|
concrete at 2-2:30 // JC Phone #: ###-#### ele conduit 7ft wide under ft need engineering to aprove ft support loading to grade.
|
BLD-Footing | 2/11/2014 | 2/12/2014 | 2/12/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Foundation | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### rfi to follow 16" vert to match wall.
|
BLD-Footing | 1/10/2014 | 1/14/2014 | 1/14/2014 | P | NR |
Jim Storey
|
|
|
Rebar around 2 - Jc Phone #: ###-####
|
BLD-Footing | 1/9/2014 | 1/10/2014 | 1/10/2014 | P | DEFR |
Jim Storey
|
|
|
Rebar around 2 - Jc Phone #: ###-####
|