BLD-Final | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 | | PASS |
Jim Storey
|
|
|
temp ok
|
FIRE-Final Inspection | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | PASS |
Jim Page
|
|
|
Associated FIR permits with this BLD permit complete, life fire safety passed/complete
|
BLD-Final | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | PASS |
Jim Storey
|
|
|
Gary Phone #: ###-#### tco ok for bld e per aproved plan.
|
FIRE-Final Inspection | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | PART |
Thomas Walsh
|
|
|
Fire and life-safety inspection for wing E, including inspection and test of exit signs and emergency egress lighting, run off the generator. Added (3) exit signs from last inspection - all passed/tested OK, including exit discharge lighting. Fire extinguishers OK and fire wall separating wing E from F&G installed on all floors. Tested Area of Refuge communication systems, however the basement and level 2A stations are not operating. Will followup on these with F&G inspections. Temp. occupancy for Wing E approved by this office. Fire alarm and fire sprinkler systems are to remain in-service at all times.
|
FIRE-Final Inspection | 10/5/2015 | 10/6/2015 | 10/6/2015 | P | PART |
Thomas Walsh
|
|
|
Fire and life-safety inspection for Wing E, including exit signs and emergency exit lighting. Need to add an exit sign at the east end of the egress corridor (all floors) directing residents to stair F1 (separation stair between wings E & F). Some other exit signs did not light on battery. A retest will be conducted after these changes are made.
|
BLD-Final | 10/5/2015 | 10/6/2015 | 10/6/2015 | A | NR |
Jim Storey
|
|
|
Gary Phone #: ###-####
|
BLD-Final | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | DEFR |
Jim Storey
|
|
|
Gary Phone #: ###-####
|
FIRE-Conference | 8/28/2015 | 8/28/2015 | 8/28/2015 | P | DONE |
Thomas Walsh
|
|
|
Meeting with GC (Ben-Petra) to review Wing E being added to TCO.
|
BLD-Aging Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 | | NR |
Jim Storey
|
|
|
|
BLD-Final | 6/12/2015 | 6/17/2015 | 6/17/2015 | A | PART |
Jim Storey
|
|
|
JC Phone #: ###-####
|
FIRE-Final Inspection | 6/12/2015 | 6/15/2015 | 6/15/2015 | A | PASS |
Thomas Walsh
|
|
|
Final inspection for FLS of Wings C and D - note Wing E has been removed from this permit. Fire extinguishers - OK Exit signage and emergency lighting tested OK (off generator). Fire lane marking OK Knox Box installed at main lobby and FD called to lock keys into box. EVAC signs are temporary while permanant signs to be installed by owner.
|
BLD-Final | 6/12/2015 | 6/15/2015 | 6/15/2015 | A | CANC |
Jim Storey
|
|
|
Jesus Phone #: ###-####
|
BLD-Final | 6/12/2015 | 6/15/2015 | 6/15/2015 | A | CANC |
Bob Archibald
|
|
|
JC// wing C Phone #: ###-####
|
BLD-Final | 6/11/2015 | 6/12/2015 | 6/12/2015 | P | NR |
Tony Young
|
|
|
JC// wing C Phone #: ###-####,, conference only,, need trades 1st,, walk through only
|
BLD-Final | 6/9/2015 | 6/10/2015 | 6/10/2015 | P | NR |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/22/2015 | 5/26/2015 | 5/26/2015 | A | NR |
Jim Storey
|
|
|
Gary Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/30/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Jim Storey
|
|
|
E-Wing Hallway; Gary Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/30/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Jim Storey
|
|
|
2nd Floor; Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2015 | 4/29/2015 | 4/29/2015 | P | NR |
Jim Storey
|
|
|
gary - 3rd floor -- E Coord Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Jim Storey
|
|
|
John// D, 1st floor Phone #: ###-#### ceillings ok to cover
|
BLD-Ceiling Grid Inspection | 4/15/2015 | 4/15/2015 | 4/15/2015 | P | PART |
Jim Storey
|
|
|
to cover // John Phone #: ###-#### ceilling ok 3 pipe fire chalk/ holes sealed
|
BLD-Energy code compliance | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | PASS |
Jim Storey
|
|
|
fire to cover. first floor E // Gary Phone #: ###-#### top of 3hr ok
|
BLD-Ceiling Grid Inspection | 4/7/2015 | 4/8/2015 | 4/8/2015 | A | PASS |
Jim Storey
|
|
|
Wing D 2nd floor. To cover late morning // Gary Phone #: ###-####
|
BLD-Energy code compliance | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Jim Storey
|
|
|
Gary-E hallway 2nd floor Phone #: ###-####
|
BLD-Other | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Jim Storey
|
|
|
Gary// soffit inspection 1st floor bldg. E Phone #: ###-####
|
BLD-Other | 3/13/2015 | 3/16/2015 | 3/16/2015 | P | PASS |
Jim Storey
|
|
|
Gary-soffit-would like as late as possible-insepction-2nd floor of the E wing Phone #: ###-####
|
BLD-Other | 3/13/2015 | 3/13/2015 | 3/13/2015 | P | FAIL |
Jim Storey
|
|
|
Gary-soffit-would like as late as possible-insepction-2nd floor of the E wing Phone #: ###-####
|
BLD-Wall cover | 3/6/2015 | 3/6/2015 | 3/6/2015 | P | PASS |
Jim Storey
|
|
|
Gary-soffits-E wing 3rd floor Phone #: ###-####
|
BLD-Conference | 3/5/2015 | 3/6/2015 | 3/6/2015 | A | PASS |
Jim Storey
|
|
|
Gary-soffits-E wing 3rd floor Phone #: ###-####
|
BLD-Framing/Rough-in | 3/5/2015 | 3/5/2015 | 3/5/2015 | P | PASS |
Jim Storey
|
|
|
Gary-soffits-E wing 3rd floor Phone #: ###-#### ok to cover
|
BLD-Other | 2/26/2015 | 2/27/2015 | 2/27/2015 | P | PASS |
Jim Storey
|
|
|
Gary// D 2nd floor-fire soffit Phone #: ###-####
|
BLD-Energy code compliance | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | PASS |
Jim Storey
|
|
|
Gary// E 4th floor Phone #: ###-#### f 4th ok airseal// e 1st ceillings ok insulation
|
BLD-Framing/Rough-in | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | PASS |
Jim Storey
|
|
|
Hard lid ceilings Bldg D - John Phone #: ###-#### billing rm 107 strucral repair complet ok/ ceilling soffits ok to cover
|
BLD-Framing/Rough-in | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PART |
Tony Young
|
|
|
Hard lid ceilings Bldg D - John Phone #: ###-####,, not ready,, walk through conference only
|
BLD-Framing/Rough-in | 2/11/2015 | 2/12/2015 | 2/12/2015 | A | PASS |
Jim Storey
|
|
|
First floor of E building // Gary Phone #: ###-#### air sealant 1,2,3 floors ok to insulate walls// 1st floor first six rooms ceillings ok to gyp bld d
|
BLD-Energy code compliance | 2/10/2015 | 2/11/2015 | 2/11/2015 | A | DEFR |
Jim Storey
|
|
|
First floor of E building // Gary Phone #: ###-####
|
BLD-Other | 2/4/2015 | 2/5/2015 | 2/5/2015 | A | PASS |
Jim Storey
|
|
|
Gary// one hour assembly inspecton for D corridor Phone #: ###-#### corridor side of occupancy wall installed fire dampers pending// colm. wip gyp protection.
|
BLD-Other | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | PASS |
Jim Storey
|
|
|
Dimising wall, 1st Bldg E - Gary Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/27/2015 | 1/28/2015 | 1/28/2015 | A | PASS |
Jim Storey
|
|
|
Gary// E wing-2nd floor Phone #: ###-#### ceilling insulation and rc channel ok
|
BLD-Energy code compliance | 1/20/2015 | 1/20/2015 | 1/20/2015 | P | PASS |
Jim Storey
|
|
|
JC- 1st floor wing E Phone #: ###-#### pending mech submital
|
BLD-Energy code compliance | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PART |
Jim Storey
|
|
|
JC-east floor E wing Phone #: ###-#### ok to sheer
|
BLD-Energy code compliance | 1/9/2015 | 1/9/2015 | 1/9/2015 | P | PASS |
Jim Storey
|
|
|
exterior insultaion // JC Phone #: ###-#### 2nd and third e
|
BLD-Framing/Rough-in | 1/5/2015 | 1/6/2015 | 1/6/2015 | P | PART |
Jim Storey
|
|
|
JC-e wing trusses Phone #: ###-####
|
BLD-Other | 12/23/2014 | 12/24/2014 | 12/24/2014 | A | NR |
Jim Storey
|
|
|
fire colcking // Jc Phone #: ###-####
|
BLD-Energy code compliance | 12/23/2014 | 12/24/2014 | 12/24/2014 | A | NR |
Jim Storey
|
|
|
Jc Phone #: ###-####
|
BLD-Framing/Rough-in | 12/22/2014 | 12/23/2014 | 12/23/2014 | A | PART |
Jim Storey
|
|
|
Gary Phone #: ###-#### 2nd floor coridor ok
|
BLD-Framing/Rough-in | 12/18/2014 | 12/19/2014 | 12/19/2014 | A | PART |
Jim Storey
|
|
|
John// BLDG. D Phone #: ###-#### broken truss/ hangers/ fire blk/ ok to insulate exterior walls
|
BLD-Other | 12/18/2014 | 12/19/2014 | 12/19/2014 | A | PASS |
Jim Storey
|
|
|
John//1st floor soffitt inspection on C Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | NR |
Jim Storey
|
|
|
Gary-soffit cover inspection first floor C Phone #: ###-####
|
Extend Permit 90/180 days | 12/15/2014 | 12/15/2014 | 12/15/2014 | A | PASS |
Jim Storey
|
|
|
exterior ok to cover
|
BLD-Framing/Rough-in | 12/9/2014 | 12/10/2014 | 12/10/2014 | A | PASS |
Jim Storey
|
|
|
late morning or early afternoon no rush//Gary Phone #: ###-#### e ok to cover ceilling of corridor
|
BLD-Wall cover | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | PASS |
Jim Storey
|
|
|
Gary Phone #: ###-#### 2nd floor ceilling drops ok to cover.
|
BLD-Wall cover | 12/3/2014 | 12/3/2014 | 12/3/2014 | A | PASS |
Jim Storey
|
|
|
4th floor coridor ok to cover
|
BLD-Wall cover | 12/1/2014 | 12/2/2014 | 12/2/2014 | P | DEFR |
Jim Storey
|
|
|
as early in pm as possible//Gary Phone #: ###-#### out of time
|
BLD-Other | 11/28/2014 | 12/1/2014 | 12/1/2014 | A | FAIL |
Jim Storey
|
|
|
fire colt. // JC Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/28/2014 | 11/28/2014 | 11/28/2014 | A | NR |
Jim Storey
|
|
|
brett ###-#### - wing c 2nd floor
|
BLD-Wall Bracing | 11/28/2014 | 11/28/2014 | 11/28/2014 | A | PASS |
Jim Storey
|
|
|
brett ###-#### - exterior bld-e
|
BLD-Other | 11/19/2014 | 11/20/2014 | 11/20/2014 | A | PASS |
Jim Storey
|
|
|
ceiling insulation// JC Phone #: ###-####
|
BLD-Wall cover | 11/13/2014 | 11/13/2014 | 11/13/2014 | A | PASS |
Jim Storey
|
|
|
north wall ok to cover exterior.
|
BLD-Wall Bracing | 11/7/2014 | 11/10/2014 | 11/10/2014 | P | PART |
Jim Storey
|
|
|
JC Phone #: ###-#### unit septration walls ok to cover.
|
BLD-Framing/Rough-in | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### truss repair ok
|
BLD-Wall Bracing | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### 2nd floor interior ok
|
BLD-Energy code compliance | 10/30/2014 | 10/31/2014 | 10/31/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### 3hird floor/ 2 nd floor ceillings 2nd floor c wing ok to cover.
|
BLD-Framing/Rough-in | 10/30/2014 | 10/31/2014 | 10/31/2014 | A | PASS |
Jim Storey
|
|
|
3st fl C wing soffits - JC Phone #: ###-####
|
BLD-Energy code compliance | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PART |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Framing/Rough-in | 10/30/2014 | 10/30/2014 | 10/30/2014 | P | FAIL |
Jim Storey
|
|
|
Late afternoon for 3st fl C wing soffits - JC Phone #: ###-#### need fire stopping
|
BLD-Framing/Rough-in | 10/28/2014 | 10/28/2014 | 10/29/2014 | P | NR |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Other | 10/23/2014 | 10/24/2014 | 10/24/2014 | A | PASS |
Jim Storey
|
|
|
JC-fire soffitt Phone #: ###-#### soffits ok 4th floor
|
BLD-Energy code compliance | 10/16/2014 | 10/17/2014 | 10/17/2014 | A | PART |
Jim Storey
|
|
|
2nd fl C wing - Gary Phone #: ###-#### air seal for iecc exterior wall and floor ok.
|
BLD-Energy code compliance | 10/6/2014 | 10/7/2014 | 10/7/2014 | A | NR |
Jim Storey
|
|
|
JC Phone #: ###-#### need truss co. to provide field review of truss mods and provide letter of aproval.
|
BLD-Framing/Rough-in | 10/2/2014 | 10/3/2014 | 10/3/2014 | A | FAIL |
Jim Storey
|
|
|
jc - late morning Phone #: ###-#### truss patch 409/407 and third floor/ header at bearing/ i joist hole from bearing 39 x 6 dia/ fire treat roof patch/ rated ceilling unusable spaces/ firestop per listing.
|
BLD-Framing/Rough-in | 10/1/2014 | 10/2/2014 | 10/2/2014 | A | NR |
Dave Hannah
|
|
|
Gary-remainder of C wing 3rd floor Phone #: ###-#### needs to install air seal
|
BLD-Framing/Rough-in | 9/26/2014 | 9/29/2014 | 9/29/2014 | P | CANC |
Jim Storey
|
|
|
Gary Phone #: ###-####
|
BLD-Energy code compliance | 9/25/2014 | 9/26/2014 | 9/26/2014 | A | PASS |
Dave Hannah
|
|
|
Gary Phone #: ###-#### c wing rms 307thru 310
|
BLD-Framing/Rough-in | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | PART |
Dave Hannah
|
|
|
307-308-309-310 and C wing for energy and framing // JC Phone #: ###-#### ok to cover ceilings
|
BLD-Energy code compliance | 9/19/2014 | 9/22/2014 | 9/23/2014 | P | PART |
Dave Hannah
|
|
|
Gary Phone #: ###-#### air seal 4 rooms third floor c wing
|
BLD-Framing/Rough-in | 9/11/2014 | 9/12/2014 | 9/15/2014 | A | NR |
Jim Storey
|
|
|
JC-1:00 Phone #: ###-####
|
BLD-Framing/Rough-in | 9/12/2014 | 9/15/2014 | 9/15/2014 | P | NR |
Jim Storey
|
|
|
Late afternoon - Gary Phone #: ###-#### need fire spk
|
BLD-Framing/Rough-in | 9/10/2014 | 9/11/2014 | 9/11/2014 | P | DEFR |
Dave Hannah
|
|
|
JC-1:00 Phone #: ###-#### resceduled for 8/12 out of time today
|
BLD-Wall Bracing | 8/27/2014 | 8/27/2014 | 8/27/2014 | P | PART |
Jim Storey
|
|
|
JC Phone #: ###-####missing misc. straps for exterior wall bracing/ interior wall bracing ok.
|
BLD-Wall Bracing | 8/21/2014 | 8/21/2014 | 8/21/2014 | P | PART |
Jim Storey
|
|
|
Jason Phone #: ###-#### coridor ok to pre gyp/ exterior ok to cover/1st floor
|
BLD-Conference | 6/24/2014 | 6/25/2014 | 6/25/2014 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### aproved rfi 00206/ copy archived
|
BLD-Framing/Rough-in | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | DEFR |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Framing/Rough-in | 5/23/2014 | 5/23/2014 | 5/23/2014 | P | PART |
Jim Storey
|
|
|
JC Phone #: ###-####
|
BLD-Other | 5/2/2014 | 5/5/2014 | 5/5/2014 | A | PASS |
Jim Storey
|
|
|
j.c. - slab on deck Phone #: ###-#### beam rebar per design
|