Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD13-00252
StatusFinaled
Name K & H CONSTRUCTION
Site Address 3848 E TIMBERSAW DR
Project Name 
Customer Number 
ePlanReviewNo
Description
"PERMIT TO CONVERT THE TEMPORARY SALES OFFICE BACK TO THE SINGLE FAMILY DWELLING USE"""TEMPORARY SALES OFFICES HAVE BEEN CONSTRUCTED IN THE GARAGE AND THE OVERHEAD GARAGE DOOR OPENING HAS BEEN INFILLED FOR HOME SALES IN THE SUBDIVISION. AN ADDITIONAL PERMIT WILL BE REQUIRED FOR PERMANENT OCCUPANCY OF THE DWELLING AND TO REMOVE THE TEMPORARY WALLS AND INSTALL THE OVERHEAD GARAGE DOOR" Permit for the construction of a new 2528 sq. ft., two story (first story 1928 sq. ft., second story 600 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 174 sq. ft. of covered patio/porch and a 820 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/22/20164/22/20164/22/2016PPASS
DetailsPhil Shearer
Austin Phone #: ###-####
DOC - Permit Finaled4/22/20164/22/20164/22/2016PPASS
DetailsPhil Shearer
BLD-Aging Inspection2/29/20162/29/20162/29/2016 PEND
DetailsPhil Shearer
BLD-Aging Inspection12/30/201512/30/201512/30/2015 DONE
DetailsPhil Shearer
BLD-Aging Inspection1/20/20151/20/20151/21/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection11/18/201411/18/201411/18/2014 PEND
DetailsPhil Shearer
BLD-Aging Inspection7/1/20147/1/20147/7/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection4/29/20144/29/20144/29/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection2/25/20142/25/20142/25/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection12/24/201312/24/201312/24/2013 PEND
DetailsDave Hannah
BLD-Final10/23/201310/23/201310/24/2013PPART
DetailsDave Hannah
Barb-TEMP OCCUPANCY ONLY Phone #: ###-#### ok for temp must remove sales office from garage and returne to org plan before a prem c/o can be issued.
BLD-Final10/16/201310/17/201310/18/2013AFAIL
DetailsDave Hannah
Rollo Phone #: ###-#### garage has been turned into a sales office.
BLD-Energy code compliance6/19/20136/20/20136/20/2013APASS
DetailsJim Storey
rollo Phone #: ###-####
BLD-Framing/Rough-in6/17/20136/18/20136/18/2013APASS
DetailsDave Hannah
Raul Phone #: ###-####
BLD-Wall Bracing4/29/20134/29/20134/30/2013PPASS
DetailsDave Hannah
BLD-Framing/Rough-in4/29/20134/29/20134/29/2013PPASS
DetailsDave Hannah
Shear inspection please-Raul Phone #: ###-####
BLD-Foundation3/12/20133/14/20133/14/2013APASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing3/12/20133/13/20133/13/2013APART
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Work in progress on installing reinforcement. noted to concrete contractor of the additional 30x30 inch column pad footings with #4 bar each way on approoved set of plans that were red lined.