Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD13-00260
StatusFinaled
Name VERTICAL CORP
Site Address 2513 S FEDERAL WAY Unit: 106
Project NameCreate Common Good - Addition
Customer Number 
ePlanReviewYes
Description
(Create Common Good) To construct a new 80 square foot, one story, wood framed vestibule, as well as, a concrete slab for support of a new 85 square foot pre-built walk-in cooler and a new 85 square foot pre-built walk-in freezer. The new walk-in cooler and freezer boxes will be accessed from the new vestibule. The freezer and cooler boxes to have minimum 6 inch foam roof construction to resist anticipated snow drift loads shown on the structural calculations. This permit also includes any associated site improvements. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/10/20136/10/20136/10/2013PPASS
DetailsJim Storey
Back concrete landing has been completed. thx Phone #: ###-#### >> Inspection requested via web by Todd Weltner final ok
BLD-Final5/31/20135/31/20135/31/2013PFAIL
DetailsJim Storey
wrong entry previosly/ need landing at exit door.
FIRE-Final Inspection5/30/20135/31/20135/31/2013APASS
DetailsForrest France
Scope of work completed. Fire life safety inspection passed.
BLD-Final5/30/20135/31/20135/31/2013PPASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Todd Weltner
BLD-Framing/Rough-in5/7/20135/8/20135/8/2013PPASS
DetailsJim Storey
Please give me a call if you have any questions. thx Phone #: ###-#### >> Inspection requested via web by Todd Weltner
BLD-Footing4/15/20134/16/20134/16/2013APASS
DetailsJim Storey
early as poss//Todd Phone #: ###-####