BLD-Final | 7/22/2013 | 7/23/2013 | 7/23/2013 | A | PASS |
Mike Jordan
|
|
|
john Phone #: ###-####. ok for perm occ. received all paperwork for interior finishes. Will have scanned in.
|
BLD-Final | 7/19/2013 | 7/22/2013 | 7/22/2013 | A | FAIL |
Mike Jordan
|
|
|
john Phone #: ###-####. Needsto provide paperwork for wall finish and for curtain.
|
FIRE-Final Inspection | 7/17/2013 | 7/19/2013 | 7/19/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Framing/Rough-in | 6/12/2013 | 6/13/2013 | 6/13/2013 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jonathan Pearson. HArdlids ok.
|
BLD-Framing/Rough-in | 6/6/2013 | 6/6/2013 | 6/6/2013 | P | PASS |
Mike Jordan
|
|
|
Looking for a walls rough inspection , so I can hang the back of house area to continue with ACT ceiling. Phone #: ###-#### >> Inspection requested via web by Jonathan Pearson. walls only ok.
|
BLD-Wall Bracing | 6/4/2013 | 6/4/2013 | 6/4/2013 | P | CANC |
Mike Jordan
|
|
|
The site is located on the first floor near the Cheesecake Factory entrance area. I pass the escalator and head toward the center stairs area. The Barricade has a big logo AVEDA Phone #: ###-#### >> Inspection requested via web by Jonathan Pearson
|
BLD-Conference | 6/4/2013 | 6/4/2013 | 6/4/2013 | P | DONE |
Mike Jordan
|
|
|
The site is located on the first floor near the Cheesecake Factory entrance area. I pass the escalator and head toward the center stairs area. The Barricade has a big logo AVEDA Phone #: ###-#### >> Inspection requested via web by Jonathan Pearson. Discussion pertaining to additional wall braces on tenant seperation walls per detail on approved plans. Noted to contractor due to sesmic requirements, kickers may not be required, but would need an RFI from engineer to delete them.
|