BLD-Final | 9/18/2013 | 9/18/2013 | 9/18/2013 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 9/18/2013 | 9/18/2013 | 9/18/2013 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 5/29/2013 | 5/29/2013 | 5/29/2013 | A | PASS |
Forrest France
|
|
|
Phase one and two completed, inspection passed.
|
FIRE-Final Inspection | 5/28/2013 | 5/28/2013 | 5/28/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
FIRE-Final Inspection | 5/13/2013 | 5/13/2013 | 5/13/2013 | P | PART |
Forrest France
|
|
|
2nd floor NW corner and center south new offices passed fire life safety inspection.
|
BLD-Final | 4/30/2013 | 5/1/2013 | 5/1/2013 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-#### ok first phase
|
FIRE-Final Inspection | 4/30/2013 | 4/30/2013 | 4/30/2013 | P | PART |
Forrest France
|
|
|
Remodel work at nine new office rooms passed fire life safety inspection (NW corner and south central second floor). East side work is incomplete.
|
BLD-Framing/Rough-in | 4/17/2013 | 4/18/2013 | 4/18/2013 | A | PASS |
Jim Storey
|
|
|
call bob ###-####
|