BLD-Final | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | PASS |
Jim Sly
|
|
|
Jim call me to meet you, I have the stamped letter from the engineer you requested. Phone #: ###-#### >> Inspection requested via web by Miles Hash Final letter of approval from Axiom Engeneering signed by Preston Lee Harrison 10618.
|
DOC - Permit Finaled | 7/24/2013 | 7/24/2013 | 7/24/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/19/2013 | 7/22/2013 | 7/22/2013 | A | NR |
Jim Sly
|
|
|
Miles-Please call prior to inspection Phone #: ###-#### Need Final letter of approval from Engineer......Stamped and signed.
|
BLD-Final | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | CANC |
Tom Arcoraci
|
|
|
Call before not on site thanks Miles, I have the inspection reports from MTI and the engineer Phone #: ###-#### >> Inspection requested via web by Miles Hash---Contractor called and cancelled @ 2:41pm
|
BLD-Conference | 7/8/2013 | 7/9/2013 | 7/10/2013 | A | DONE |
Jim Sly
|
|
|
call Miles with time, not on site. this is to look at roof joist repair, it has been inspected by Axiom Engineering, will have paperwork on hand. Phone #: ###-#### >> Inspection requested via web by Miles Hash
|