BLD-Final | 3/6/2014 | 3/7/2014 | 3/7/2014 | A | PASS |
Dave Hannah
|
|
|
Fire inspection on 8th floor CTA. Coordinate with Adam or Roger for final walk. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 3/6/2014 | 3/7/2014 | 3/7/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed. Minor corrections finished while on site. Inspection passed.
|
BLD-Conference | 2/27/2014 | 2/27/2014 | 2/27/2014 | P | DONE |
Dave Hannah
|
|
|
Pre Final Walk thru, 8th Floor CTA. Coordinate walk with Adam or Roger, PM. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Ceiling Grid Inspection | 2/14/2014 | 2/14/2014 | 2/20/2014 | P | PASS |
Dave Hannah
|
|
|
Ceiling grid inspection, 8th floor CTA requested by Roger. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 11/12/2013 | 11/13/2013 | 11/13/2013 | A | PASS |
Dave Hannah
|
|
|
adam Phone #: ###-#### ok to cover walls
|