BLD-Final | 3/1/2016 | 3/3/2016 | 3/3/2016 | A | PASS |
Jim Storey
|
|
|
would like call 30min ahead; Suzen Phone #: ###-####
|
DOC - Permit Finaled | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD - Request for Extension | 11/23/2015 | 11/24/2015 | 11/24/2015 | A | NR |
Jim Storey
|
|
|
Suzen Phone #: ###-#### need plm final insp.
|
BLD-Conference | 6/15/2015 | 6/17/2015 | 6/17/2015 | P | PART |
Jim Storey
|
|
|
Susan Phone #: ###-#### pending plm before bld inspection
|
BLD - Request for Extension | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | PASS |
Jim Storey
|
|
|
Waiting on Ele, and misc interior finish work for final - Suzen Phone #: ###-####
|
BLD - Request for Extension | 5/16/2014 | 5/19/2014 | 5/19/2014 | A | PASS |
Jim Storey
|
|
|
Suzen Phone #: ###-#### home owner job ok in progress
|
BLD-Conference | 1/27/2014 | 1/28/2014 | 1/28/2014 | A | PASS |
Jim Storey
|
|
|
call before // Lin Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | PASS |
Jim Storey
|
|
|
call with results of inspection // Frank Phone #: ###-####
|
BLD-Energy code compliance | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | PASS |
Jim Storey
|
|
|
call with results of inspection // Frank Phone #: ###-####
|
BLD-Wall Bracing | 8/22/2013 | 8/22/2013 | 8/22/2013 | P | PASS |
Jim Storey
|
|
|
JAMES Phone #: ###-####
|
BLD-Footing | 8/7/2013 | 8/8/2013 | 8/8/2013 | A | PASS |
Jim Storey
|
|
|
mike Phone #: ###-####
|
BLD-Framing/Rough-in | 8/2/2013 | 8/2/2013 | 8/2/2013 | P | NR |
Jim Storey
|
|
|
james Phone #: ###-#### mech failled
|
BLD-Framing/Rough-in | 6/20/2013 | 6/21/2013 | 6/21/2013 | A | PASS |
Jim Storey
|
|
|
Suzen-Shear inspection-please call prior to inspection Phone #: ###-####
|
BLD-Foundation | 6/11/2013 | 6/12/2013 | 6/12/2013 | A | PASS |
Jim Storey
|
|
|
Wade Lambert-Please call with results Phone #: ###-####
|
BLD-Footing | 6/7/2013 | 6/7/2013 | 6/7/2013 | P | PASS |
Tom Arcoraci
|
|
|
Please call when passed - Wade Phone #: ###-####
|