Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD13-01286
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 10193 W SMOKE RANCH DR
Project NameUnion Square Apts - Phase II
Customer Number 
ePlanReviewYes
Description
(UNION SQUARE APTS)(BLDG#12) **BLD13-01287, BLD13-01288, & BLD13-01289 PLANS ARE ATTACHED TO THIS CASE** - To construct a wood frame, Two story, 19,732 sq. ft., 16 Unit Multi Family Dwellings - 1 (2B/2B Type 'A'), 3 (2B/2B Type 'B'), 4 (2B/1B Type 'B'), 4 (2B/2B), and 4 (2B/1B), per reviewed plans. All units exceed 800 sq. ft., are fully sprinklered W/ alarm. Work includes associated site work, footing & foundation, structural & non-structural framing; electrical, mechanical, plumbing, sprinkler & alarm work; fire-resistive construction between units, at stair enclosures or rated corridor breezeways; accessible Type 'A' & 'B' units; interior cabinetry, wall, floor and ceiling finishes and fixtures. All work shall comply with the approved drawings, the plan review report, and all applicable codes. This building will be fire sprinkled with a 13R sprinkler system. **SRZ** DRH13-00005 CUP12-00064
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/5/20146/6/20146/5/2014APASS
DetailsMike Jordan
BLD-Final3/19/20143/19/20143/19/2014PPASS
DetailsMike Jordan
late afternoon - Fred Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning signs perm.
FIRE-Final Inspection3/19/20143/19/20143/19/2014PPASS
DetailsTroy Cobbley
life safety passed
BLD-Wall cover12/2/201312/3/201312/3/2013APASS
DetailsMike Jordan
1st. floor, remainder of center units ok to tape.
BLD-Wall cover12/2/201312/2/201312/2/2013PPART
DetailsMike Jordan
1st. floor, east central units ok to tape.
BLD-Wall cover11/27/201312/2/201312/2/2013APART
DetailsMike Jordan
Center Units first floor Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Work in progress, 1st. floor, center units.
BLD-Wall cover11/20/201311/20/201311/20/2013PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st floor, base layer on ceilings ok.
BLD-Energy code compliance11/15/201311/15/201311/15/2013APASS
DetailsMike Jordan
Wall insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue
FIRE-Sprinkler Rough-in11/13/201311/13/201311/13/2013PPASS
DetailsTroy Cobbley
Tenting inspection passed
FIRE-Sprinkler Rough-in11/11/201311/12/201311/12/2013PFAIL
DetailsTroy Cobbley
Tenting inspection failed due to many problem areas. I left a voice message for Mike. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Framing/Rough-in11/11/201311/12/201311/12/2013APART
DetailsMike Jordan
fire caulking / framing Phone #: ###-#### >> Inspection requested via web by Mike McHargue. ok to insulate. Pendinf electrical rough in inspection and firesprinkler tenting.
BLD-Energy code compliance11/11/201311/12/201311/12/2013APART
DetailsMike Jordan
Air Sill Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Air seal ok.
BLD-Conference10/30/201310/30/201310/30/2013ADONE
DetailsMike Jordan
BLD-Wall Bracing10/15/201310/16/201310/16/2013APASS
DetailsMike Jordan
Hold downs blding 12, two no north end, two on south end. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Missing and or loose holdowns installed and tightend.
BLD-Wall Bracing10/14/201310/15/201310/15/2013ANR
DetailsMike Jordan
BLD-Wall Bracing10/14/201310/14/201310/14/2013PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Wall Bracing10/11/201310/14/201310/14/2013AFAIL
DetailsMike Jordan
BLD-Wall Bracing10/9/201310/9/201310/9/2013PFAIL
DetailsMike Jordan
North end hold downs re inspect Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Holdowns still missing or not yet installed.
BLD-Wall Bracing9/24/20139/24/20139/24/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Exterior shear nailing ok, 1st. and 2nd. floors.
BLD-Concrete8/15/20138/15/20138/15/2013PPASS
DetailsMike Jordan
North slab on grade thicken footings building 12 Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Concrete8/14/20138/15/20138/15/2013ACANC
DetailsMike Jordan
North end building 12 slab thickend footing Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Concrete8/13/20138/13/20138/13/2013PPART
DetailsMike Jordan
South slab on grade thickened footings Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Energy code compliance8/2/20138/2/20138/2/2013PPASS
DetailsMike Jordan
North end foundation insulation inspection Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Energy code compliance7/31/20137/31/20137/31/2013PPASS
DetailsMike Jordan
Foundation Insulation south end of building 12. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Foundation7/30/20137/31/20137/31/2013APASS
DetailsMike Jordan
North half of building 12. John with foundations will call. Ready now. Phone #: ###-#### >> Inspection requested via web by Mike McHargue
BLD-Foundation7/29/20137/29/20137/29/2013PPART
DetailsMike Jordan
Blding 12 south end stemwall inspection. Ready for a 1PM pour. John with foundations will call. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Stemwall and column pedestals, south half only.
BLD-Footing7/24/20137/24/20137/24/2013PPASS
DetailsMike Jordan
BLD-Footing7/24/20137/24/20137/24/2013ANR
DetailsMike Jordan
Bld 12 footing rebar inspection. John with Foundations LLC will call to confirm time should be mid morning. Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Moved to pm.