Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-01332
StatusFinaled
Name SHY-BEE INC
Site Address 2750 S PALMATIER WAY
Project NameHarris Ranch Community Center
Customer Number 
ePlanReviewYes
Description
Harris Ranch Subdivision #7 - Pool and Post Office Box Building - To construct a 1,380 square foot, one story, wood framed and concrete swimming pool support building and related site improvements. This building will contain mens and womens restrooms, lockers and showers, a family restroom, a mechanical room and a post office box room. This permit was modified to include the construction of the shade structure as part of this permit. A separate permit will be required to install the swimming pools and enclosure fencing. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/8/20141/10/20141/10/2014APASS
DetailsDave Hannah
Tim-Please call prior to insepction Phone #: ###-####
BLD-Conference1/2/20141/3/20141/3/2014APART
DetailsJim Storey
tim Phone #: ###-####
BLD-Final12/12/201312/13/201312/13/2013ANR
DetailsJim Storey
Tim Phone #: ###-####plm/ada isues
FIRE-Final Inspection12/12/201312/13/201312/13/2013APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final11/22/201311/22/201311/25/2013PPART
DetailsDave Hannah
Post office temp occ - Tim Phone #: ###-#### ok to use the post office box area
BLD-Final11/21/201311/21/201311/22/2013PNR
DetailsDave Hannah
tim Phone #: ###-####
FIRE-Final Inspection11/19/201311/19/201311/20/2013PNR
DetailsForrest France
Need to post building address numbers, missing main entry door, project finishes underway, approved plans not available on site. Project is not in condition for final fire life safety inspection.
BLD-Framing/Rough-in10/30/201311/5/201311/5/2013PPASS
DetailsDave Hannah
Tim Phone #: ###-####
BLD-Framing/Rough-in10/16/201310/17/201310/17/2013APART
DetailsDave Hannah
tim Phone #: ###-#### ok to insulate mail room and back wll in rest room
BLD-Footing10/11/201310/11/201310/11/2013PPASS
DetailsDave Hannah
Tim-Footing is for the trellis Phone #: ###-####
BLD-Wall Bracing9/19/20139/20/20139/20/2013APASS
DetailsJim Storey
Tim Phone #: ###-####
BLD-Wall Bracing9/12/20139/18/20139/18/2013PFAIL
DetailsMike Jordan
Tim Phone #: ###-####. Provide staple conversion from engineer. 1.5 inch staples used. staples over driven.
BLD-Foundation8/15/20138/16/20138/19/2013APASS
DetailsDave Hannah
partial foundation for 2ft walls//tim Phone #: ###-####
BLD-Footing7/31/20137/31/20138/2/2013PPART
DetailsDave Hannah
pat Phone #: ###-#### rebar ok but needs spec. inspection
BLD-Final12/16/201312/17/2013 P 
DetailsDave Hannah
Tim Phone #: ###-####