FIRE-Final Inspection | 8/14/2013 | 8/14/2013 | 8/14/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety final okayed.
|
BLD-Final | 8/6/2013 | 8/6/2013 | 8/6/2013 | P | PASS |
Dave Hannah
|
|
|
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz
|
BLD-Final | 6/27/2013 | 6/28/2013 | 7/3/2013 | A | PART |
Dave Hannah
|
|
|
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz ok for temp occ needs to finish installing glass
|
FIRE-Final Inspection | 6/26/2013 | 6/27/2013 | 6/28/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Framing/Rough-in | 6/12/2013 | 6/13/2013 | 6/13/2013 | A | PASS |
Dave Hannah
|
|
|
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz
|