Permit Information
Permit NumberBLD13-01375
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 601 S 9TH ST
Project NameSage Charter School
Customer Number 
ePlanReviewYes
Description
(SAGE CHARTER SCHOOL) Permit to demo the raised platform in the first floor computer lab server room to enlarge the size of computer lab and to construct a new learning lab on the second floor. Second floor scope of work; to include nonbearing wall with 2 doors and 2 windows as per approved plans. Minor electrical and mechanical for new learning lab, no new plumbing fixtures. Interior finishes shall meet the requirements of chapter 8 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **AJS**Modification to plans to leave portion or elevated floor in 1st floor computer room and convert to server room. see revised plans for demo and construction details.8/13/13 ajs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/21/20138/22/20138/23/2013PPASS
DetailsDave Hannah
Ron Phone #: ###-####
DOC - Permit Finaled8/23/20138/23/20138/23/2013APASS
DetailsDave Hannah
FIRE-Final Inspection8/20/20138/22/20138/22/2013APASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in8/12/20138/13/20138/15/2013APASS
DetailsDave Hannah
ron Phone #: ###-####
BLD-Framing/Rough-in8/13/20138/14/20138/14/2013APASS
DetailsMike Jordan
ron Phone #: ###-####. Interior steel studs for new wall at 1st. floor computer classroom per approved revised plan.
BLD-Framing/Rough-in8/8/20138/9/20138/9/2013APART
DetailsDave Hannah
Ron Phone #: ###-#### second floor ok to cover after elec but they have changed the first floor and need to resubmit plans