BLD-Final | 11/5/2013 | 11/6/2013 | 11/7/2013 | P | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-#### ok for perm occ
|
BLD-Final | 8/7/2013 | 8/8/2013 | 8/8/2013 | A | PART |
Dave Hannah
|
|
|
Michael Thomas Phone #: ###-#### ok for temp occ needs to fix ada restroom
|
FIRE-Final Inspection | 8/7/2013 | 8/8/2013 | 8/8/2013 | A | PASS |
Forrest France
|
|
|
Correction items verified for completion. Life safety finaled.
|
FIRE-Final Inspection | 8/7/2013 | 8/7/2013 | 8/7/2013 | P | FAIL |
Forrest France
|
|
|
C/N items include; provide current certification for the fire extinguisher, post signage at the main entry/exit, provide approved style hardware at office 102 marked exit door.
|
BLD-Framing/Rough-in | 7/26/2013 | 7/29/2013 | 7/29/2013 | A | PASS |
Dave Hannah
|
|
|
Michael Thomas (secondary contact is Justin Flynn ###-####) Phone #: ###-####
|