Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD13-01507
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameSt. Lukes-East Tower
Customer Number 
ePlanReviewNo
Description
(ST LUKES-EAST TOWER-GROUND FLOOR)(Endoscopy Suite Remodel) To remodel a 3,122 square foot Endoscopy Suite within an existing I-2 hospital. Approval of this remodel is contingent upon adhering to the approved plans and structural engineering on file. Scope of work includes: new interior partitions to redefine endoscopy procedure room, new interior partitions to redefine instrument processing and decontamination room, new lighting, new structural bracing / attachment of new equipment to structural slab above, modify existing mechanical system, installation of new plumbing, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/23/20147/23/20147/23/2014APASS
DetailsJim Sly
if possible 10:30 to 12:00 Phone #: ###-#### Inspection requested via web by phil doble
DOC - Permit Finaled7/23/20147/23/20147/23/2014PPASS
DetailsJim Sly
FIRE-Final Inspection7/23/20147/23/20147/23/2014APASS
DetailsTroy Cobbley
Life safety passed
BLD-Ceiling Grid Inspection7/17/20147/17/20147/17/2014APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by phil doble
BLD-Wall cover6/19/20146/20/20146/20/2014APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by phil doble
BLD-Ceiling Grid Inspection5/6/20145/6/20145/6/2014APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by phil doble
FIRE-Sprinkler Rough-in4/30/20144/30/20144/30/2014PPART
DetailsForrest France
Okay to cover overhead fire sprinkler work completed to date as marked on approved plans including endo #4.
BLD-Wall cover4/15/20144/15/20144/15/2014APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by phil doble
BLD-Final3/25/20143/26/20143/26/2014APART
DetailsDave Hannah
temp occ. Phone #: ###-#### >> Inspection requested via web by phil doble ok to move into phase one
BLD-Ceiling Grid Inspection2/28/20142/28/20142/28/2014APASS
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by phil doble
BLD-Ceiling Grid Inspection2/6/20142/7/20142/7/2014ANR
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by phil doble
BLD-Wall cover1/21/20141/21/20141/21/2014APASS
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by phil doble
BLD-Wall cover1/6/20141/7/20141/7/2014APART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by phil doble ok to cover walls 1st phase